Advanced positioning directly-buried anchor bolt prefabricated pipeline support construction technology based on BIM
A construction technology and anchor bolt technology, which is applied in the construction technology field of prefabricated pipeline support for direct buried anchor bolts in advance, can solve problems such as pipeline positioning errors, increased rework, pipeline collisions, etc., to improve construction quality, improve work efficiency, and improve overall structure sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0054] The BIM-based construction technology of prefabricated pipeline support for direct buried anchor bolts in advance provided in this embodiment includes the following steps:
[0055] (1) Construction preparation
[0056] 1 Familiarize yourself with the drawings and determine the range where direct buried anchors are required. Corridors in public areas and pipelines in the basement are relatively concentrated. In the later stage, the cross-construction of various specialties is serious, and the method of pre-positioning and pre-embedding is adopted; there are relatively few pipelines in the room, and the traditional method of construction is adopted in combination with the on-site schedule.
[0057] 2 Installation technicians intervene in electromechanical installation work in advance. Combined with the construction schedule of the civil works, communicate with civil engineering technicians to formulate detailed pre-embedded schedules for the main construction.
[0058] ...
Embodiment 2 application example
[0080] 1 Reconstruction Project of Qingdao Port Drug Inspection Institute
[0081] The reconstruction project of Qingdao Port Drug Inspection Institute is located at No. 7 Longde Road, Shinan District, Qingdao City. The building structure is a frame shear wall structure, with 2 floors underground and 10 floors above ground. The building height is 46.6m and the building area is 18118.4㎡. This project is a large-scale modern drug inspection institute, with many majors in the installation of electromechanical equipment, electrical, water supply and drainage, ventilation and air conditioning, intelligent systems, professional piping systems and other functional equipment and pipelines. This construction method solves the comprehensive problems of various pipelines The layout speeds up the construction efficiency of the pipeline support and improves the installation quality.
[0082] 2 Biotechnology R&D Center Construction Project
[0083] The biotechnology research and developmen...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com