A kind of shallow buried underground tunnel waterproof construction method

A technology of shallow burial and underground excavation and construction method, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., and can solve problems such as water seepage and affecting the construction quality of comprehensive pipe corridors

Active Publication Date: 2022-04-15
CHINA CONSTR SENVENTH ENG BUREAU INSTALLATION ENG
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The temporary support in the whole process includes the vertical steel frame 101 and the horizontal steel frame 102. The initial support includes the top support 103, the side support 104 and the bottom support. When the second lining is constructed, only the horizontal steel frame 102 Removed, the vertical steel frame 101 is directly poured in the partition wall, since the vertical steel frame 101 passes through the concrete of the second lining roof and the second lining concrete at the same time, and the concrete of the second lining roof is under the top support 103, when the concrete shrinks , gaps are likely to appear between the vertical steel frame 101 and the concrete of the second-lining top slab and the concrete of the second-backing slab, and the risk of water seepage downward along the vertical steel frame 101 is likely to occur, which affects the construction quality of the comprehensive pipe gallery

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of shallow buried underground tunnel waterproof construction method
  • A kind of shallow buried underground tunnel waterproof construction method
  • A kind of shallow buried underground tunnel waterproof construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0027] Embodiments of the waterproofing construction method for shallow-buried underground excavation tunnels of the present invention:

[0028] Such as figure 2 , image 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 Shown, the waterproof construction method of shallow buried tunnel method of the present invention comprises the following steps:

[0029] Step 1. Spray two layers of two-component polyurethane waterproof coating 3 with a set thickness on the surface of the vertical steel frame 1 before the initial support and respraying of the steel frame for the initial support. The vertical steel frame 1 is installed in the actual project I-shaped steel is used in the middle, and a water stop ring 18 whose shape matches the vertical steel frame 1 is set at the circumferential position of the cross section of the vertical ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a waterproof construction method of a shallow-buried underground excavation tunnel. The waterproof construction method of a shallow-buried underground excavation tunnel includes six steps. The surface of the steel frame is sprayed with at least two layers of two-component polyurethane waterproof coating with a set thickness, and a water stop ring whose shape matches the vertical steel frame is installed at the circumferential position of the cross section of the vertical steel frame; Set up a waterproof reinforcement layer at the welded connection between the steel frame and the top horizontal steel frame and perform closing treatment; then carry out initial support surface treatment, so that the thickness of the primary support and re-sprayed concrete is less than the laying length of the waterproof reinforcement layer on the vertical steel frame ; Before the second lining, the horizontal temporary support is removed, and the high-density polyethylene waterproof board and geotextile with a set thickness are laid. The high-density polyethylene waterproof board and geotextile are sealed and connected with the waterproof reinforcement layer. Improve the waterproof effect and improve the quality of underground tunnel construction.

Description

technical field [0001] The invention relates to the technical field of comprehensive pipe gallery engineering constructed by a shallow-buried underground excavation method, in particular to a waterproof construction method for shallow-buried underground excavation tunnels. Background technique [0002] Shallow burial and underground excavation method refers to the premise of improving the geological conditions in the weak surrounding rock formation, focusing on controlling the surface settlement, using grids and anchor shotcrete as the initial support means, following the "New Austrian Method" theory, according to The "Eighteen Characters" guideline (advanced pipe, strict grouting, short excavation, strong support, quick closure, frequent measurement) is used for tunnel design and construction. Shallow burial and underground excavation have flexible structural forms, have little impact on ground buildings, roads, and underground pipelines, and have the advantages of less lan...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/38E21D11/10
CPCE21D11/38E21D11/105
Inventor 常红庆李忠明牛敬森徐锁锋华林林靳书平张欣李纯盼刘杰张红丹
Owner CHINA CONSTR SENVENTH ENG BUREAU INSTALLATION ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products