Engineering construction progress plan management and control system and method based on BIM model
A technology of schedule planning and model, applied in the field of engineering construction, can solve problems such as rework, incomplete elements, one-sided influencing factors, etc., and achieve the effect of reducing repetitive work and improving execution efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0079] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments.
[0080] In this example, a BIM model-based engineering construction schedule control method; used for BIM coding, BIM model control, BIM plan generation, BIM progress feedback, BIM progress simulation and plan revision; see figure 1 , including the following steps:
[0081] S1. Establish a unified BIM coding standard;
[0082] See Table 1. The unified BIM coding standard includes project information, workshop information, business information, professional information, spatial area information, floor information, category information, equipment coding information, etc.
[0083] Table 1 Basic material attributes and product attributes
[0084]
[0085] For a BIM model, a model component code can be expressed as: XXX.002.ER.BA.DB1.1F.PR.PR01
[0086] S2. Establish BIM model
[0087] In the BIM modeling software, the 3D model is built according to pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com