A BIM model-based project construction schedule control system and method
A technology of schedule planning and model, applied in the field of engineering construction, can solve problems such as rework, incomplete elements, unreasonable plan generation, etc., to reduce repetitive work and improve execution efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0079] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments.
[0080] In this example, a BIM model-based engineering construction schedule control method; used for BIM coding, BIM model control, BIM plan generation, BIM progress feedback, BIM progress simulation and plan revision; see figure 1 , including the following steps:
[0081] S1. Establish a unified BIM coding standard;
[0082] See Table 1. The unified BIM coding standard includes project information, workshop information, business information, professional information, spatial area information, floor information, category information, equipment coding information, etc.
[0083] Table 1 Basic material attributes and product attributes
[0084]
[0085] For a BIM model, a model component code can be expressed as: XXX.002.ER.BA.DB1.1F.PR.PR01
[0086] S2. Establish BIM model
[0087] In the BIM modeling software, the 3D model is built according to pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com