Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for rapidly repairing monolithic ballast bed settlement in skylight period

A construction method and technology of an integral ballast bed, applied in the field of rail transit, can solve the problems of difficulty in ensuring the construction quality of the rail bottom slope, difficulty in installing rail first aid devices, and increased rail wear, so as to shorten emergency response time, reduce train operation and passenger travel. The effect of the small amount of on-site engineering

Inactive Publication Date: 2020-09-15
CHINA RAILWAY ERYUAN ENG GRP CO LTD
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The purpose of the present invention is to: cast-in-place rail platform ballast or pillowless ballast with cement mortar in the prior art is easy to be damaged, has poor durability, and the construction quality of the rail bottom slope is difficult to guarantee, resulting in increased rail wear and small rail bottom gaps , it is very difficult to install rail first-aid devices for emergency repairs when the rails are broken, and provide a rapid repair construction method that completes the settlement of the overall ballast bed within the skylight period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for rapidly repairing monolithic ballast bed settlement in skylight period
  • Construction method for rapidly repairing monolithic ballast bed settlement in skylight period
  • Construction method for rapidly repairing monolithic ballast bed settlement in skylight period

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0046] Such as Figure 1-5 As shown, this embodiment provides a construction method for rapid repair of integral ballast bed settlement within the skylight period. The construction method is carried out during the skylight period, including the following steps:

[0047] S1: Use the height adjustment fastener 4 to restore the line position;

[0048] Specifically, first determine the scope of ballast bed improvement on site according to the results of the optimized route;

[0049] Before the construction of the overall ballast bed, organize technical personnel to retest the track laying standard to ensure the accuracy of track construction. After the results meet the specification requirements, mark the control points and pay attention to protecting the control piles during the construction process;

[0050] Transport height adjustment fasteners 4, short sleepers, steel bars, formwork, mortar and other materials to the operation section as required;

[0051] Use colored cloth to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for rapidly repairing monolithic ballast bed settlement in a skylight period. The repairing construction method is used for being carried out in a skylight period and comprises the following steps that height adjusting fasteners are adopted for recovering line positions, original long sleepers and surrounding ballast bed concrete are chiseled away, newshort sleepers are laid, reinforcing steel bars are implanted, formworks are erected, and pouring is carried out through polymer cement mortar. The sleeper is repaired and constructed in the skylightperiod; according to the construction method, through the polymer cement mortar, pouring and maintaining are performed to form a new ballast bed structure; rapid recovery of monolithic ballast bed settlement is realized; the construction method is small in on-site engineering quantity; the polymer cement mortar can quickly harden a ballast bed; and the ballast bed repairing construction period isshortened, an influence on operation is greatly reduced, a gap between a rail bottom and a ballast bed surface is increased through the height adjusting fasteners, a space requirement for installinga steel rail emergency device during work rush repair can be met, emergency disposal time is shortened, and the influence on train operation and passenger travel is reduced.

Description

technical field [0001] The invention relates to the field of rail transit, in particular to a construction method for quickly repairing integral ballast bed settlement within a skylight period. Background technique [0002] With the continuous improvement of the level of urban modernization in our country, the development of rapid rail transit system has become an inevitable choice for the construction of urban public transportation. However, there are obvious differences in the geological conditions of various cities. Some cities, such as Shanghai, Tianjin, Guangzhou, Hangzhou, and Ningbo, belong to soft soil areas. Such geological conditions have brought challenges to the stability of the tunnel after operation. In recent years, due to the uneven settlement of the underlying soil of the tunnel, the influence of adjacent construction, the change of ground load and water level, the asynchronous deformation of the tunnel and the station, leakage, and vibration excitation of s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01B37/00E01B1/00
CPCE01B1/00E01B37/00
Inventor 杨明辉田春香李粮余张凯葛根荣刘喆丰刘在庆曹保
Owner CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products