Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Trestle type top opening full cross-section synchronous construction equipment and construction method thereof

A synchronous construction and full-section technology, applied in mining equipment, shaft equipment, earthwork drilling and mining, etc., can solve the problems of long construction period of guide pillars, high costs of various types, and low construction efficiency, so as to reduce the investment of personnel and auxiliary equipment , save cost and construction space, and ensure the effect of construction quality

Pending Publication Date: 2020-04-17
HUNAN WUXIN MACHINERY
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In some tunnels without filling layer design, the traditional waterproof board, steel bar installation trolley and full-section formwork trolley have no track placement position, the overall positioning and movement of the trolley is not fast and convenient, and it is difficult to position and reinforce the formwork
Needle beam trolleys are also used in some small tunnels, but the lining cannot meet the requirements of excavation and opening to traffic
Due to the above factors, the construction period of the guide column is lengthened, the construction efficiency is low, and various costs are large.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Trestle type top opening full cross-section synchronous construction equipment and construction method thereof
  • Trestle type top opening full cross-section synchronous construction equipment and construction method thereof
  • Trestle type top opening full cross-section synchronous construction equipment and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any limiting effect on the protection scope of the present invention. .

[0032] Such as Figure 1-Figure 8 Shown, the concrete structure of the present invention is:

[0033] A trestle-type upper opening full-section synchronous construction equipment, including a self-propelled trestle 1, the self-propelled trestle 1 is provided with a full-section formwork trolley 4 with an inverted U-shaped overall structure; the lower end of the full-section formwork trolley 4 The inverted arch formwork 3 for pouring the bottom surface of the tunnel is hoisted, and the top formwork for pouring the top surface of the tunnel is arranged above; the inverted arch formwork 3 and the top for...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses trestle type top opening full cross-section synchronous construction equipment and a construction method thereof and belongs to the technical field of tunnel construction and underground construction. A full cross-section formwork trolley is arranged on a self-propelled trestle. An invert formwork is hoisted at the lower end of the full cross-section formwork trolley. A topformwork is arranged above the invert formwork. The invert formwork is located below the self-propelled trestle. The top formwork is composed of a first top formwork body and a second top formwork body. The lower end of the first top formwork body and the lower end of the second top formwork body are hinged to the two ends of the invert formwork correspondingly, and the first top formwork body and the second top formwork body are connected with side cylinders at the hinged positions. The inner side face of the first top formwork body and the inner side face of the second top formwork body arein supporting connection with the full cross-section formwork trolley through detachable connecting rods. The two sides of the full cross-section formwork trolley are provided with lifting columns controlled to rise and drop through lifting cylinders. The lower ends of the lifting columns are connected with the invert formwork. The trestle type top opening full cross-section synchronous construction equipment can realize full cross-section one-time synchronous pouring construction of a tunnel without affecting excavation of the tunnel during construction and passing of construction equipmentvehicles in the tunnel, and the construction efficiency is improved.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction and underground engineering, in particular to a trestle-type upper opening full-section synchronous construction equipment and a construction method thereof. Background technique [0002] With the rapid development of my country's infrastructure construction, the requirements for tunnel construction are getting higher and higher, and the requirements for the rapid ringing of full-section formwork and the section arc are getting higher and higher in the construction of some tunnels. At present, the promotion of self-propelled trestles has combined the pouring of the inverted arches under the trestles relatively well, and the trestles can carry the rapid movement, positioning and reinforcement of the integral inverted arch formwork. However, due to the need for the layout of the waterproof board and the construction area arrangement of the secondary lining reinforcement, as well as the s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10
CPCE21D11/10E21D11/102E21D11/105
Inventor 许思军尹斌毛成宝向其兴郑怀臣张维颂
Owner HUNAN WUXIN MACHINERY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products