Trestle type lower-opening full-cross-section synchronous construction equipment and construction method thereof

A simultaneous construction and full-section technology, which is applied to mining equipment, underground chambers, shaft equipment, etc., can solve the problems of extended construction period of guide pillars, high costs of various types, and low construction efficiency, so as to reduce the investment in personnel and auxiliary equipment , save cost and construction space, and ensure the effect of construction quality

Pending Publication Date: 2020-03-20
HUNAN WUXIN MACHINERY
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In some tunnels without filling layer design, the traditional waterproof board, steel bar installation trolley and full-section formwork trolley have no track placement position, the overall positioning and movement of the trolley is not fast and convenient, and it is difficult to position and reinforce the formwork
Needle beam trolleys are also used in some small tunnels, but the lining cannot meet the requirements of excavation and opening to traffic
Due to the above factors, the construction period of the guide column is lengthened, the construction efficiency is low, and various costs are large.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Trestle type lower-opening full-cross-section synchronous construction equipment and construction method thereof
  • Trestle type lower-opening full-cross-section synchronous construction equipment and construction method thereof
  • Trestle type lower-opening full-cross-section synchronous construction equipment and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any limiting effect on the protection scope of the present invention. .

[0029] Such as Figure 1-Figure 9 As shown, a specific embodiment: a trestle-type lower opening full-section synchronous construction equipment, a trestle-type lower opening full-section synchronous construction equipment, including a self-propelled trestle 1, the self-propelled trestle 1 is provided with an overall structure It is an inverted U-shaped full-section formwork trolley 4; a top form 49 for pouring the top surface of the tunnel is arranged above the full-section formwork trolley 4; the two ends of the top form 49 are hinged side forms 50; the side forms 50 The side cylinder 48 is connected...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses trestle type lower-opening full-cross-section synchronous construction equipment and a construction method thereof, and belongs to the technical field of tunnel construction and underground engineering. The equipment comprises a self-propelled trestle, wherein a full-cross-section template trolley is arranged on the self-propelled trestle; an integral framework of the full-cross-section template trolley is in a reverse U shape; a top die is arranged above the full-cross-section template trolley; the two ends of the top die are hinged to side dies; the side dies are connected with the full-cross-section template trolley through side oil cylinders; a bottom die is hinged to the lower end of each of the two side dies, and hinging positions are connected through a bottom oil cylinder; the two bottom dies are mutually connected through a bottom connecting rod; the top die, the side dies and the bottom dies jointly form a full-cross-section template of a tunnel; ascending and descending posts controlled to vertically ascend or descend by ascending and descending oil cylinders are arranged at the two sides of the full-cross-section template trolley; and the lower end of each ascending and descending post is provided with a moving wheel. The trestle type lower-opening full-cross-section synchronous construction equipment and the construction method have the advantages that the simultaneous pouring construction of the full cross section of the tunnel can be realized; in the construction process, the tunnel excavation is not influenced; the passing of construction equipment vehicles in the tunnel is not influenced; and the construction efficiency is improved.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction and underground engineering, in particular to a trestle-type lower opening full-section synchronous construction equipment and a construction method thereof. Background technique [0002] With the rapid development of my country's infrastructure construction, the requirements for tunnel construction are getting higher and higher, and the requirements for the rapid ringing of full-section formwork and the section arc are getting higher and higher in the construction of some tunnels. At present, the promotion of self-propelled trestles has combined the pouring of the inverted arches under the trestles relatively well, and the trestles can carry the rapid movement, positioning and reinforcement of the integral inverted arch formwork. However, due to the need for the layout of the waterproof board and the construction area arrangement of the secondary lining reinforcement, as well as the s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10
CPCE21D11/10E21D11/102E21D11/105
Inventor 毛成宝杨芳向其兴张维颂郑怀臣许思军
Owner HUNAN WUXIN MACHINERY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products