A Construction Method for Stations by Tunneling First and Open Cut Method for Stations
A station and open cut technology, applied in tunnels, artificial islands, tunnel linings, etc., to achieve the effects of reducing the number of receiving and starting times, ensuring construction quality, and saving costs and inputs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0049] refer to figure 1 , a kind of station construction method of cut-and-cover method of station after tunnel first, comprises the following steps:
[0050] 1.1 Tunnel first and then station shield machine excavation;
[0051] 1) Excavation requirements for passing shield machines:
[0052] When tunneling in the station, the shield machine tunnels strictly according to the designed route. If it encounters a hard and unknown object, it stops tunneling immediately, finds out the reason, and takes corresponding measures before continuing tunneling. Strengthen the monitoring in the segment hole during the pile foundation construction after the shield machine passes the station, and timely give an early warning when the data exceeds the limit, and find out the situation.
[0053] 2) Determination of the segment position at the portal before pa...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com