A high-level grouting device for prefabricated concrete wall sleeve grouting construction

A concrete wall and sleeve grouting technology, which is applied in the direction of buildings, building reinforcements, building components, etc., can solve the problem of the stability of the connection between the reinforcement device and the plastic hose, which cannot ensure the smooth flow of the slurry, and the material Waste and other problems, to prolong the time of grouting, improve smooth progress, and enhance the effect of grip

Active Publication Date: 2021-05-11
NANTONG ZHONGHUI CONSTR TECH CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the deficiencies of the prior art, the present invention provides a high-level grouting device for prefabricated concrete wall sleeve grouting construction, which solves the problem that the grouting sleeve assembly cannot be well adjusted according to the distance between steel bars in the above-mentioned background technology. If the device is adjusted to a proper position, the stability of the connection between the device and the plastic hose cannot be enhanced very well, and when the connecting rod is damaged, the general device is likely to directly cause damage to the device, resulting in waste of materials, which cannot be done well The problem of ensuring the smooth flow of slurry

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A high-level grouting device for prefabricated concrete wall sleeve grouting construction
  • A high-level grouting device for prefabricated concrete wall sleeve grouting construction
  • A high-level grouting device for prefabricated concrete wall sleeve grouting construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

[0027] In the description of the present invention, unless otherwise stated, the meaning of "plurality" is two or more; the terms "upper", "lower", "left", "right", "inner", "outer" , "front end", "rear end", "head", "tail", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than Nothing indicating or implying that a referenced device or element must have a particular orientation, be constructed, and operate in a particular orientation should therefore not be construed as limiting ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an assembled concrete wall sleeve grouting construction high-level grouting device, relates to the technical field of assembled walls, in particular to an assembled concrete wall sleeve grouting construction high-level grouting device, including fixed steel pipes and Connecting steel pipes, the inside of the connecting steel pipes is provided with air holes, the inside of the fixed steel pipes is provided with a limit mechanism, and the fixed steel pipes are located on the left and right sides of the connecting steel pipes, and the side of the fixed steel pipes away from the connecting steel pipes is fixed with a sleeve , and a diversion mechanism is installed above the sleeve, and steel bars are installed on the side of the sleeve away from the fixed steel pipe. The prefabricated concrete wall sleeve grouting construction high-level grouting device is provided with a limit hole, a limit block and a spring steel sheet, and the cooperation between the limit hole, the limit block and the spring steel sheet can limit the connecting steel pipe and the The positions between the fixed steel pipes can effectively provide different restrictive positions for length changes between the connected steel pipes and the fixed steel pipes through the limit holes.

Description

technical field [0001] The invention relates to the technical field of fabricated walls, in particular to a high-level grouting device for sleeve grouting construction of fabricated concrete walls. Background technique [0002] Buildings assembled from prefabricated parts and components on site are called prefabricated buildings. According to the form and construction method of prefabricated components, they can be divided into five types: block building, plate building, box building, skeleton plate building and rising plate building. At present, the performance of wall reinforcement in domestic prefabricated construction projects is poor in terms of high-level grouting technology, which is difficult to effectively solve, and the construction personnel's skills vary during the construction process. [0003] A grouting sleeve assembly is disclosed in the Chinese invention patent application publication specification CN108316565A. Although the grouting sleeve assembly solves t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04C5/16
CPCE04C5/165
Inventor 张惠唐嘉恒
Owner NANTONG ZHONGHUI CONSTR TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products