Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Coiled tubing perforation segmental fracturing method in long borehole casing for gas drainage in coal mine

A gas extraction and staged fracturing technology, which is used in gas discharge, mining equipment, and production fluids, etc., and can solve the problem that the open-hole full-hole fracturing cracks are not extended for a long time, the location of the fracturing cracks is uncertain, and the extraction and drilling holes are not long enough. problems such as difficulty in drilling holes, etc., to achieve the effect of good fracturing reconstruction effect, low construction friction resistance, and improvement of drilling gas drainage and drainage efficiency.

Active Publication Date: 2020-11-24
XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The purpose of the present invention is to provide a continuous pipe perforation segmental fracturing method in the long borehole casing for underground gas drainage in coal mines, which can overcome the problem of gas drainage drilling along the coal seam in broken and soft coal seams existing in the current underground gas pre-drainage in coal mines Difficulty in forming holes, short extension of open-hole full-hole fracturing fractures, uncertain location of fracturing fractures, small and uneven drainage influence range, poor drainage effect, short duration, etc., to achieve long drilling for gas drainage Hole formation and multi-stage precise staged fracturing

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Coiled tubing perforation segmental fracturing method in long borehole casing for gas drainage in coal mine
  • Coiled tubing perforation segmental fracturing method in long borehole casing for gas drainage in coal mine
  • Coiled tubing perforation segmental fracturing method in long borehole casing for gas drainage in coal mine

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] see figure 1 , shows the coal mine underground coal seam roof gas drainage method for staged fracturing with coiled tube perforation in long borehole casing of the present invention.

[0040] The continuous pipe perforation segmental fracturing method in the long borehole casing for gas drainage in the coal mine comprises the following steps:

[0041] Step 1: Under the coal mine, from the roof 2 of mudstone or sandstone at a certain distance from the top boundary of the broken soft coal seam 1, drill a gas drainage long borehole 3 of a preset length;

[0042] Specifically, the directional construction of the gas drainage long borehole 3 is carried out from the bottom slate roadway or the roof slate roadway by using the tunnel directional drilling rig for coal mines. The horizontal section of the gas drainage long borehole 3 is located above the top of the broken soft coal seam 1 In the roof 2 of mudstone or sandstone between 0.5m-2m, the drilling length is preferably g...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A continuous pipe perforation fracturing method in a long borehole casing for underground gas drainage in a coal mine, comprising: step 1: in the coal mine, from a mudstone or sandstone roof at a certain distance from the top boundary of a broken and soft coal seam or from a hard rock of a broken and soft coal seam Construction of long boreholes for gas drainage in layered or hard coal seams with good coal structure; Step 2: Insert guide shoe and rigid casing; Step 3: Annular space between long borehole and rigid casing for gas drainage Carry out cement slurry plugging and solidification; Step 4: use coiled tubing to drag the packer to pack and segment, injectors to blast and perforate, and annulus between coiled tubing and casing to perform fracturing; Step 5: Start out of the fracturing tool, and the fracturing fluid is sprayed in a unified manner; the present invention can overcome the difficulty in forming holes in gas drainage drilling, uncertain location of fracturing crack initiation, short extension of fracturing cracks, poor fracturing reconstruction effect, and poor pumping efficiency. In order to solve the problems such as small and uneven mining influence range and short drainage duration, long drilling holes and multi-stage precise segmental fracturing for gas drainage are realized.

Description

technical field [0001] The invention relates to the technical field of gas control, in particular to a continuous tube perforation segmental fracturing method in long borehole casings for gas drainage in coal mines. Background technique [0002] Among all kinds of coal mine disasters, gas disaster is the biggest disaster in my country's coal mine safety production. Therefore, coal seam gas must be pre-drained in advance before coal mining to ensure safe and efficient production of coal mines. [0003] At present, the pre-drainage of coal seam gas in underground coal mines mainly adopts the methods of drilling through the bed and drilling along the bed. In order to improve the air permeability of the coal reservoir, hydraulic fracturing measures have been adopted, which has achieved certain results, but the following problems still exist: [0004] (1) It is difficult to drill gas drainage holes in broken and soft coal seams, and the drilling depth is shallow; when drilling ga...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21F7/00E21B43/26
CPCE21B43/26E21F7/00
Inventor 张群范耀姜在炳孙四清舒建生赵继展茹婷刘柏根
Owner XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products