Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

a delay slide

A sliding sleeve and time-delay mechanism technology, which is applied in the direction of wellbore/well components, construction, production fluid, etc., can solve the problems of coiled tubing operation length limitation, long cycle, high cost, etc., and achieve low cost, short operation cycle, and easy operation. simple effect

Active Publication Date: 2021-03-09
PETROCHINA CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] If it is necessary to perform fracturing operations in deep horizontal wells, then perforating the fracturing string through coiled tubing to establish the first section of fracturing channels in oil and gas wells not only has a long period and high cost, but also is limited by the wellbore trajectory. and coiled tubing operation length limitation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • a delay slide
  • a delay slide
  • a delay slide

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] In order to make the objects, technical solutions, and advantages of the present invention, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0042] It should be noted that the following "left", "right" direction refers to the direction in which the delay slide provided in the horizontal wells is provided in the horizontal well, which is located in the horizontal well toe. (Ie the front end). When the delay slider is applied to the vertical well, the following "left", "right" can be understood as "" "" "" down "direction.

[0043] Embodiments of the present invention provide a delayed slide, such as attached figure 1 Attachment figure 2 Attachment image 3 As shown, the delay slide includes: the left joint 1, the outer cylinder 2, the right joint 3, and the inner cylinder 4, the separator ring 5, the delay mechanism 6, and the inner cylinder 4, the delay mechanism 6, and activation ring 7. Whe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a time-delay sliding sleeve, which belongs to the field of oil field development. The time-delay sliding sleeve includes: a left joint, an outer cylinder, a right joint connected in sequence from left to right, an inner cylinder, a separation ring, a time-delay mechanism and a starting ring. Wherein, the cylinder diameter at the left end of the inner cylinder is larger than that at the right end, and is slidably sleeved in the outer cylinder. The inner cylinder is connected to the starting ring, and a sealed annular space is provided between the inner cylinder and the outer cylinder, and the starting ring is used to separate from the inner cylinder after the pressure reaches a preset value. A fracturing hole located on the left side of the annular space is arranged on the side wall of the outer cylinder. Hydraulic oil is arranged in the right chamber, and the delay mechanism is used to control the flow of hydraulic oil and the real-time on-off of the right chamber and the left chamber. The time-delay sliding sleeve provided by the present invention can not only meet the construction requirements of establishing the first fracturing channel, but also has simple operation, short operation period and low cost, and can precisely control the communication time between the inner cavity of the inner cylinder and the fracturing hole, realizing full Wellbore pressure test.

Description

Technical field [0001] The present invention relates to a very good oil-air field development, and in particular, there is a delayed slide. Background technique [0002] In a very organic oil-retrieval development, in order to improve the fluid environment in the underground, the oil well production increases, and the segmental fracturing operation is generally required. Before the fracturing operation, it is important to establish a first fracturing channel in the oil and gas well. [0003] Related techniques For fracturing operation, the consecutive tubes are used on a fracturing tube on a fracturing tube or a routine to establish a first fracturing passage in an oil and gas well. [0004] The inventors have found that the prior art has at least the following problems: [0005] If the fracturing operation is required in a deeper horizontal well, then the continuous tubes are emitted on the fracture tube to establish a first segment fracturing channel in the oil and gas well, no...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B43/26E21B34/08
CPCE21B34/085E21B43/26E21B2200/06
Inventor 帅春岗李杰李明魏微邓千里付玉坤何明格梅蕾
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products