Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Big data based construction management method of engineering project with standard technology and storage medium

A technology for process engineering and construction management, applied in data processing applications, instruments, resources, etc., can solve the problems of automatic task push of project managers, backward intelligent management and control, etc., to change manual collection and input, realize intelligent, The effect of improving efficiency

Active Publication Date: 2018-11-06
FUJIAN UNIV OF TECH
View PDF8 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The current project management system solves the problem of management tools, but it is still relatively backward in terms of intelligent management and control
[0003] The existing engineering project management system cannot solve: (a) automatic generation of project cost information, (b) automatic arrangement of project construction progress, (c) standardization of project quality control, (d) automatic push of project management personnel's work tasks, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Big data based construction management method of engineering project with standard technology and storage medium
  • Big data based construction management method of engineering project with standard technology and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0052] Please refer to figure 2 , This embodiment provides a big data-based standard process engineering project construction management method, the method includes the following steps:

[0053] 1. Data collection:

[0054] Step 11: Extract the project category, project cost information (including standard personnel, materials, and number of machines), project elevation or layer number information, project management personnel allocation standards, construction work logic flow, and process standards for massive housing construction and municipal projects Information such as quality requirements, process operation standard working hours, etc., combined with standard construction method information, forms a standard process engineering project construction management database;

[0055] Massive project data including project category u i , Project cost information l i , Project elevation or layer number information v i , Engineering project management staffing standardsψ i And constru...

Embodiment 2

[0075] This embodiment corresponds to the first embodiment and provides a computer storage medium on which a computer program is stored. When the program is executed by the processor of the system, it can realize the construction management of the standard process engineering project based on big data in the first embodiment. All the steps involved in the method.

[0076] In summary, the big data-based standard process engineering project construction management method and storage medium provided by the present invention utilize big data technology to collect standardized construction processes and work processes through massive engineering projects, and control project cost, schedule, and quality. , Manage the job content of the post, realize the project construction management system under the quality standardization control mode, and provide assistance for construction site management and project management of construction enterprises.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a big data based construction management method of an engineering project with a standard technology and a storage medium. The method comprises that S1) a construction management database of the engineering projects with standard technologies is generated according to construction standard data and construction method information of mass of engineering projects; and S2) after that basic information corresponding to a specific project is obtained, a management platform corresponding to the specific project is generated according to the database. The management platform comprises a list editing module, a budget management module, a progress management module and an information pushing module. The big data technology is used, the standard construction technologies and work flows are gathered via mass of engineering projects, the construction magnet system for the project cost, progress, quality control and working content of management posts is realized in a qualitystandardized control mode, and help is provided for construction site management and building construction enterprise project management.

Description

Technical field [0001] The invention relates to the field of data analysis and processing, in particular to a standard process engineering project construction management method and storage medium based on big data. Background technique [0002] The project management system is widely used in construction projects at home and abroad. The current project management system solves the problem of management tools, but it is still relatively backward in terms of intelligent management and control. [0003] Existing engineering project management systems cannot solve: a. automatic generation of project cost information, b. automatic scheduling of project construction schedules, c standardization of project quality control, d automatic push of tasks for project managers. [0004] Therefore, there is a need to provide a project management system that can solve the above-mentioned problems. Summary of the invention [0005] The technical problem to be solved by the present invention is to pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/06313G06Q10/103
Inventor 陈群刘林李文峰王世杰曾开发黄瑜锋王杰钦陈镇西余成柱陈哲陈龙陈文灵黄骞
Owner FUJIAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products