Pervious concrete post-grouting foundation reinforcing method, transition pile and composite pile forming system
A technology for permeable concrete and foundation reinforcement, applied in the field of geotechnical engineering, can solve the problems of ineffective improvement of soil between piles, poor water permeability of pile body materials, slow foundation soil consolidation, etc., and achieves unique treatment effects and shortens construction period. , the effect of saving investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0037] A post-grouting foundation reinforcement method for permeable concrete of the present invention comprises the following steps:
[0038] 1) Use mechanical drilling to form holes to the design depth of foundation reinforcement, such as figure 1 As shown, insert the porous tube 1 (the porous tube is not pulled out, and the upper end of the porous tube is higher than the edge of the drilled hole, such as figure 2 shown); 2) Pouring permeable concrete 2 between the borehole and the perforated pipe, the height of the poured permeable concrete is close to the edge of the borehole, the permeable concrete and the perforated pipe are poured to form a hollow permeable concrete pile, and ordinary concrete is used on the top of the pile 3 Seal the drilled holes, such as image 3 (The permeable concrete pile is the transition pile, wherein the permeable concrete 2 forms a permeable concrete layer on the periphery of the porous pipe 1, and the permeable concrete layer is fixedly con...
Embodiment approach 2
[0043] A kind of post-grouting foundation reinforcement method of permeable concrete of the present invention, such as Figure 6 As shown, it specifically includes the following steps:
[0044] 1) Use mechanical drilling to form holes to the design depth of foundation reinforcement, such as figure 1 As shown, insert the porous pipe (the steel pipe is not pulled out, and the upper end of the porous pipe is higher than the edge of the drilled hole, such as figure 2 shown); 2) pour permeable concrete between the borehole and the porous pipe, the height of the poured permeable concrete is close to the edge of the borehole, the poured permeable concrete and the porous pipe form a hollow permeable concrete pile, that is, a transition pile, and on the top of the pile Ordinary concrete is used to seal the borehole, such as image 3 (The permeable concrete pile is the transition pile, wherein the permeable concrete 2 forms a permeable concrete layer on the periphery of the porous pipe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com