Ecological treatment system applicable to river channel with high silt content
A technology of ecological system and ecological governance, applied in the field of water treatment, can solve the problems of difficult installation of equipment, high cost of sand cleaning technology, high cost of equipment maintenance, etc., achieve low maintenance cost, improve transparency, and restore the original ecology of the river
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Such as Figure 1-6 As shown, the present invention provides a kind of ecological management system applicable to high sediment content river courses, comprising a film-hanging unit 1 and an ecosystem unit 2, and the described ecosystem unit 2 is arranged downstream of the described film-hanging unit 1 ;
[0042] The film-hanging unit 1 is composed of at least two artificial water plant groups 3 arranged in parallel, the artificial water plant groups 3 and the revetment are vertically arranged, and the two adjacent artificial water plant groups 3 are respectively connected to the revetment on different sides thereof, A water channel 10 is arranged between the artificial water plant group 3 and the revetment, and the water channel 10 extends in a zigzag;
[0043] The artificial water plant group 3 includes a frame structure composed of two or more steel pipe piles 4, the bottom of the steel pipe piles 4 is fixed in the river bottom mud surface, and the two or more steel...
Embodiment 2
[0051] The present invention will be further described below in conjunction with the project case "a river water ecological management project in Jiangxi":
[0052] Current status of the project river:
[0053] The upstream flows through many villages, and the water and soil loss on both sides of the bank is serious. The upstream water body is turbid with high sediment content.
[0054] Project implementation:
[0055] Such as Figure 1-Figure 6 As shown, the "D"-shaped hanging membrane unit 1 is installed at the water inlet of the project river section (width 57 m), with a total length of 230 m (such asfigure 1 ), and then set the water ecosystem unit 2 to achieve the purpose of river course governance.
[0056] The "D" shaped film-hanging unit 1 is mainly composed of staggered artificial water plant groups 3, each row of artificial water plant groups 3 is 50m long and 10m wide, and a 10m blank area is left between every two rows of artificial water plant groups 3 to form a...
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
pore size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com