Estimation method of mean response time of watershed groundwater based on instantaneous unit line
A response time, unit line technology, applied in water conservancy projects, water conservancy engineering equipment, buildings, etc., can solve the problem of high cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] The technical solutions of the present invention will be further elaborated below according to the drawings and in conjunction with the embodiments.
[0048] figure 1 It is a flow chart of the method for estimating the mean response time of watershed groundwater based on the instantaneous unit line of the present invention, figure 2 For the relative position of the basin above the Sanguankou Hydrological Station and the Jinghe River Basin in the embodiment of the present invention, the basin above the Sanguankou Hydrological Station in the Jinghe River Basin is selected as an example. This basin is located in the upper reaches of the Jinghe River Basin, with a catchment area of 218km 2 , belonging to semi-humid-semi-arid climate, the average annual precipitation is 606 mm, and the annual precipitation distribution is uneven in time and space, among which the precipitation in the flood season (June to September) accounts for about 60% of the annual precipitation. The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com