Method for repairing expressway pavement
A technology for highways and gravel, applied in the field of construction, can solve the problems of poor adhesion of ordinary concrete, poor durability of repaired pavement, long operation time, etc., and achieve the effect of shortening the opening time of traffic, saving time and saving resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] In an embodiment of the present invention, a method for repairing an expressway pavement comprises the following steps:
[0019] 1) Preparation of repair materials: Weigh the raw materials according to the following parts by weight: 55 parts of Portland cement, 78 parts of sand and gravel, 21 parts of polystyrene resin, 8 parts of fatty alcohol polyoxyethylene ether, 16 parts of calamine, chitin 11 parts, 20 parts of sodium hydroxide, 40 parts of tartaric acid. Sand and gravel include fine sand <3mm, medium sand of 3-5mm, and large sand of 5-8mm, and the mass ratio is 1:1.5:1.2. Pulverize polystyrene resin, fatty alcohol polyoxyethylene ether, calamine, chitin, pass through a 100-mesh sieve, mix well, add portland cement and mix well at a stirring speed of 180r / min; then add sand and gravel and Sodium hydroxide and stir evenly, then add the required water, mix and stir for 10 minutes, then let stand for 20 minutes, then add tartaric acid, stir for 15 minutes, and let s...
Embodiment 2
[0023] In an embodiment of the present invention, a method for repairing an expressway pavement comprises the following steps:
[0024] 1) Preparation of repair materials: Weigh raw materials according to the following parts by weight: 65 parts of Portland cement, 86 parts of sand and gravel, 29 parts of polystyrene resin, 16 parts of fatty alcohol polyoxyethylene ether, 24 parts of calamine, chitin 19 parts, 28 parts of sodium hydroxide, 50 parts of tartaric acid. Sand and gravel include fine sand <3mm, medium sand of 3-5mm, and large sand of 5-8mm, and the mass ratio is 1:3:1.5. Pulverize polystyrene resin, fatty alcohol polyoxyethylene ether, calamine and chitin, pass through a 120-mesh sieve, mix well, add portland cement and mix well at a stirring speed of 300r / min; then add sand and gravel and Add sodium hydroxide and stir evenly, then add the required water, mix and stir for 15 minutes, then let it stand for 22 minutes, then add tartaric acid, stir for 20 minutes, and ...
Embodiment 3
[0028] In an embodiment of the present invention, a method for repairing an expressway pavement comprises the following steps:
[0029] 1) Preparation of repair materials: Weigh raw materials according to the following parts by weight: 58 parts of Portland cement, 80 parts of sand and gravel, 23 parts of polystyrene resin, 10 parts of fatty alcohol polyoxyethylene ether, 18 parts of calamine, chitin 13 parts, 22 parts of sodium hydroxide, 42 parts of tartaric acid. Sand and gravel include fine sand <3mm, medium sand of 3-5mm, and large sand of 5-8mm, and the mass ratio is 1:2:1.3. Pulverize polystyrene resin, fatty alcohol polyoxyethylene ether, calamine, chitin, pass through a 120 mesh sieve, mix well, add portland cement and mix well, the stirring speed is 200r / min; then add sand and gravel and Sodium hydroxide and stir evenly, then add the required water, mix and stir for 12 minutes, then let stand for 21 minutes, then add tartaric acid, stir for 18 minutes, and let stand ...
PUM
Property | Measurement | Unit |
---|---|---|
shrinkage | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com