Transaction processing method and device based on client engineering project management system
A technology of project management system and customer engineering, which is applied in the field of transaction processing based on the customer engineering project management system, can solve problems such as complexity and low work efficiency, and achieve the effect of accurate and unified processing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] According to an embodiment of the present invention, an embodiment of a transaction processing method based on a customer engineering project management system is provided. It should be noted that the steps shown in the flow chart of the accompanying drawings can be implemented in a computer such as a set of computer-executable instructions system, and, although a logical order is shown in the flowcharts, in some cases the steps shown or described may be performed in an order different from that shown or described herein.
[0019] figure 1 It is a flow chart of a transaction processing method based on a customer engineering project management system according to an embodiment of the present invention, such as figure 1 As shown, the method includes the following steps:
[0020] Step S102, if it is detected that an update operation is performed on an object in the application program, record the first data before updating the object and the second data after updating the...
Embodiment 2
[0055] According to an embodiment of the present invention, an embodiment of a transaction processing device based on a customer engineering project management system is also provided. The transaction processing method based on the client engineering project management system in Embodiment 1 of the present invention can be implemented in the device in Embodiment 2 of the present invention.
[0056] Image 6 It is a schematic diagram of a transaction processing device based on a customer engineering project management system according to an embodiment of the present invention, such as Image 6 As shown, the device includes: a first processing module 601 and a second processing module 603 .
[0057] Wherein, the first processing module 601 is configured to record the first data before updating the object and the second data after updating the object if it is detected that an update operation is performed on the object in the application program;
[0058] The second processing ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com