Utility tunnel monitoring and early warning system

An integrated pipe gallery, monitoring and early warning technology, applied in the sensing field, can solve the problems of irregular parameter and interface design, hidden dangers of integrated pipe gallery safety management, backward construction methods, etc., to achieve parameter and interface design specifications, and system compatibility. The best effect of reducing input costs

Inactive Publication Date: 2017-03-08
上海瀚所信息技术有限公司
View PDF6 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the general design of underground comprehensive pipe corridors at home and abroad is relatively conservative, and there are many problems: there are pipelines for transporting special media such as water, electricity and heat in the pipe corridor, and there are potential safety hazards of medium leakage; the comprehensive pipe corridor itself is equipped with ventilation, lighting, power supply, There are a large number of equipment maintenance and management problems in fire protection, drainage, identification, monitoring, alarm and other systems; the pipe gallery system has single or insufficient functions, and the monitoring and management are not intelligent enough; drainage, sewage and other functional pipelines cannot be integrated, occupying The underground space resources are large; the construction method is outdated, and the construction cost is high; there is no expansion function reserved for the future development of the city
[0004] At present, the publicly reported integrated pipeline corridor monitoring and early warning system mainly has the following characteristics: First, the monitoring terminal uses public networks such as GPRS / 3G / 4G for communication, and each sensor must be equipped with a SIM card, which requires a large cost investment and high operating traffic costs
Second, the monitoring terminal is implemented using short-distance interconnection technologies such as Zigbee, and the line-of-sight distance is generally short. At the same time, the environment in the pipe gallery is complex, resulting in a closer wireless signal transmission distance, which requires a large number of monitoring nodes, resulting in huge investment in municipal infrastructure.
Third, the technical means are single, and various technical means are not effectively used together. It mainly relies on the monitoring and alarm system of the pipe gallery itself, and the work efficiency is low. Especially when an equipment failure occurs in the pipe gallery, it is necessary to search for analysis drawings and read equipment Parameter information, comprehensive consideration of the connection between upstream and downstream related equipment, and combined with relevant experience can try to solve the equipment failure problem on site. There are also shortcomings such as poor interaction between the work site and the control center, outdated daily maintenance mode, and manual office work.
Fourth, due to the lack of unified technical specification guidance and application, the quality of these established systems is often mixed, the interconnection between systems is poor, data exchange is difficult to carry out, parameters and interface design are often not standardized, equipment is not compatible, and it is difficult for comprehensive The safety management of the pipe gallery brings hidden dangers
With the development and progress of science and technology, people have successively added a series of auxiliary systems to urban comprehensive utility corridors, such as automatic fire extinguishing systems, ventilation systems, video surveillance systems, environmental monitoring systems, etc., but most of these information systems only have monitoring functions, and It cannot be intelligently controlled and managed. Although it can solve the hidden safety hazards of some urban pipe networks, most of them are operated and operated independently, which is not conducive to information linkage and rapid response, and brings problems such as urban safety, environmental protection, and high management costs.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Utility tunnel monitoring and early warning system
  • Utility tunnel monitoring and early warning system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] Below, in conjunction with the accompanying drawings, preferred embodiments of the present invention are given and described in detail, so that the functions and features of the present invention can be better understood.

[0023] exist figure 1 In the shown embodiment, the comprehensive utility gallery monitoring and early warning system of the present invention adopts a three-layer architecture of comprehensive application, network transmission, and physical perception, including two functional entities of working nodes and super nodes. Among them, working nodes include multiple front-end sensing devices located in the physical perception layer; super nodes include gateway nodes located in the physical perception layer, backbone nodes and cloud servers located in the network transport layer, and control terminals located in the comprehensive application layer .

[0024] Each node in this embodiment is described in detail below:

[0025] The front-end sensing equipme...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a utility tunnel monitoring and early warning system, which comprises a physical perception layer, an integrated application layer and a network transmission layer, wherein the physical perception layer comprises a plurality of front-end perception devices and a gateway node in communication connection with each front-end perception device; the front-end perception device is set to acquire each piece of perception information in the utility tunnel; the gateway node is set to upload the perception information acquired by the front-end perception device to the network transmission layer; the network transmission layer comprises a backbone network node which is set to upload the perception information uploaded by the gateway node to the integrated application layer; the integrated application layer comprises a plurality of control terminals which are set to carry out operation processing on the perception information uploaded by the network transmission layer and provide corresponding application service according to a processing result. Various conditions in the utility tunnel can be monitored in a real-time and online mode, each relevant department can quickly take effective measures, loss caused by error reporting or missed reporting is avoided, the reliability is high, the capital construction input is little, and the maintenance and the operation are convenient and quick.

Description

technical field [0001] The invention relates to the field of sensing technology, in particular to a monitoring and early warning system for a comprehensive utility gallery. Background technique [0002] The comprehensive pipe gallery refers to the public tunnel where municipal pipelines such as water supply, rainwater, sewage, reclaimed water, natural gas, electricity, and communication are laid in a concentrated manner. Urban infrastructure engineering has become an important part of urban infrastructure. The construction of comprehensive pipe corridors in my country has just started. Since 2013, a series of policies and regulations have been issued, requiring the steady promotion of the construction of urban underground comprehensive pipe corridors. In August 2015, the State Council promulgated the "Promotion of Urban Underground Comprehensive Pipe Gallery Construction "Guiding Opinions", the comprehensive pipe gallery is regarded as a livelihood project supported by the s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01D21/02
CPCG01D21/02
Inventor 李凤荣何为赵鲁阳魏智胡育昱纪立张质懿丁华泽
Owner 上海瀚所信息技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products