Reconstruction and reinforcement method for signal tower in communication base station and reinforced signal tower
A technology of communication base stations and signal towers, which is applied in the field of signal tower transformation, can solve problems such as low resource utilization, and achieve the effects of reducing resource waste, increasing stability, and increasing cross-sectional area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] see figure 1 Shown is an embodiment of the modification and reinforcement method of the signal tower in the communication base station described in this application. The modification and reinforcement method includes:
[0060] Step 101, processing the steel pipe to the same length as the rod to be reinforced in the signal tower;
[0061] Step 102, cutting the steel pipe multiple times along the diameter direction, and the cut parts respectively form the first part of the pipe fitting and the second part of the pipe fitting;
[0062] Step 103, respectively welding the fixing pieces on the first part of the pipe fittings and the second part of the pipe fittings formed by cutting, the positions of the fixing pieces on the first part of the pipe fittings and the second part of the pipe fittings are symmetrical, and closing the When the first part of the pipe fitting and the second part of the pipe fitting are described, the symmetrical fixed pieces overlap;
[0063] Step ...
Embodiment 2
[0087] The present invention also provides a signal tower strengthened by the method for strengthening and rebuilding the signal tower above. The signal tower includes: a rod to be strengthened 10 , a first part of the pipe 20 and a second part of the pipe 30 . For the structure of the first part pipe fitting 20 and the second part pipe fitting 30 see figure 2 .
[0088] Fixed pieces 40 are symmetrically distributed on the first part of the pipe 20 and the second part of the pipe 30 ,
[0089] The first part of the pipe 20 and the second part of the pipe 30 are bonded to the rod 10 to be reinforced by structural glue, and the first part of the pipe 20 and the second part of the pipe 30 are fixed by the fixing piece 40;
[0090] The first part of the pipe fitting 20 and the second part of the pipe fitting 30 are made by cutting multiple times along the diameter direction of the steel pipe, and after each cut, the fixed piece 40 is welded on the cut part;
[0091] The fixing ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com