Diversified wind duct circulating power generating station with gradual perpetual motion power and air traction effect
A traction effect and power station technology, applied in wind power generation, photovoltaic power generation, electrical components, etc., can solve the problems of low distribution density of solar radiation energy, difficulty in accurately predicting system power generation, and difficulty in large-scale utilization and high-efficiency utilization. The effect of occupying high-quality land, not affecting climate change, and high-efficiency power generation operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0024] The air duct (hole) body (1) with an inner diameter of 1.8-5 meters and an inner diameter of 120-2500 meters will be built on the ground or underground; and the inner circumference of the air duct (hole) body (1) is respectively Install some (1.5-4.5 meters in diameter) Nei Nei wind power generators (2); at the front end of the natural wind air inlet (3) of the blower (hole) body (1), install a large air volume blower (5), blower The air outlet (4) is opposite to the natural wind air inlet (3), and the large air volume blower (5) requires a caliber of 0.8-3.8 meters; Carrying out blowing can make air and natural wind enter freely from the natural wind air inlet (3), so as to achieve the effect of natural pressurization and increase wind speed; the power of the large air volume blower (5) is 20-200KW, A high-speed index exhaust fan (7) is installed at the end (6) of the hole) body, and the exhaust fan outlet (8) draws wind speed to the outside of the air cylinder (hole) ...
example 2
[0027] 1. Construct the above-ground or underground multi-stage wind tunnel circulation power station with constant dynamic power and air traction effect. The wind tunnel (hole) body (1) is mainly constructed by mechanical trenching, with a length of 754 meters and a width of 8.8 meters at the top. The bottom is 8.5 meters wide and 3.4 meters deep. After the bottom of the ditch is compacted, make a concrete cushion of 60-120 mm. 2. On the concrete cushion, install 2 rows of cement culvert pipes side by side with a distance of 0.15-0.3 meters between them, and install elbow cement culvert pipes at both ends of the 2 rows of cement culvert pipes so that the two rows of cement culvert pipes form a circular and transparent underground Air duct (hole) body (1) girth is 1508 meters, and whole air duct (hole) body (1) is made waterproof layer and anti-air-permeable layer and is done backfill soil layer and greening ground surface on this layer. 3. The internal wind generator (2) of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com