A construction method for refined pre-embedded structure of steel structure anchor bolts

An anchor bolt and refined pre-preparation technology, which is applied in basic structure engineering, building structure, construction, etc., can solve the problems of low positioning accuracy of anchor bolts, heavy construction work, and adjustment of the spatial position of anchor bolts, etc., to achieve Improve installation efficiency, improve positioning accuracy, and quickly correct the effect

Active Publication Date: 2018-01-16
CITIC GUOAN CONSTR GRP CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although this construction method can prevent the loosening of the anchor bolts, it is difficult to adjust the spatial position of the anchor bolts, and the on-site construction workload is large, so it is difficult to effectively improve the positioning accuracy of the anchor bolts
[0005] To sum up, although the construction technology and structure of the existing steel structure anchor bolts have achieved good engineering benefits under suitable working conditions, there are still some deficiencies, which are mainly reflected in the unreasonable design of the anchor bolt positioning structure ,, low positioning accuracy of anchor bolts, insufficient overall connection strength of the structure, and difficulty in site construction and assembly of the structure, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for refined pre-embedded structure of steel structure anchor bolts
  • A construction method for refined pre-embedded structure of steel structure anchor bolts
  • A construction method for refined pre-embedded structure of steel structure anchor bolts

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The embodiments of the present invention will be further described in detail below in conjunction with the description of the drawings, but this embodiment is not used to limit the present invention. Any similar structure and similar changes that adopt the present invention should be included in the protection scope of the present invention.

[0043] Anchor bolt design and production technical requirements, pre-positioned grouting construction technical requirements, foundation concrete pouring construction technical requirements, upper and lower positioning plates design and construction technical requirements, steel bar binding or welding construction technical requirements, ground anchor bolt design And construction technical requirements, etc., will not be repeated in this embodiment, and focus on the embodiment of the method of the present invention.

[0044] figure 1 It is a schematic cross-sectional view of the structure after the installation of the refined pre-embedd...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method for a refined pre-embedded structure of a steel structural foundation bolt shaping mould. The construction method is characterized by comprising the steps of firstly, assembling an adjustable assembled mould frame on a prefabrication site or a construction site; after finishing location of structural members of the assembled mould frame, dismounting a formwork at the bottom, and enabling a foundation bolt to penetrate an assembly limiting bolt hole and a foundation bolt hole of the assembled mould frame; then, connecting an anchor bolt with a lower locating plate, and respectively adjusting the horizontality of the lower locating plate and the verticality of the foundation bolt through a levelling nut and a transverse connecting rib; next, filling a gap between an upper locating plate and the lower locating plate with a pre-locating grouting body by virtue of a pre-locating grouting pipe; and after the pre-locating grouting body is initially solidified, dismounting a formwork at the top, and carrying out foundation concrete pouring in other areas. By using the construction method, not only can the in-site installation and location time of the foundation bolt be shortened, but also the accuracy degree for locating the foundation bolt can be increased, and affects of foundation concrete pouring to the spatial position of the foundation bolt can be avoided.

Description

Technical field [0001] The invention relates to a construction method for a steel structure anchor bolt embedded structure, in particular to a steel structure anchor bolt shaping mold refined embedded structure construction method that can effectively shorten the on-site construction time and improve the positioning accuracy of the anchor bolts, belonging to In the field of construction engineering, it is suitable for the construction of steel structure anchor bolts. Background technique [0002] In recent years, with the rapid development of urban construction, the application of steel structures has become more and more common. In steel structure construction, the installation quality and positioning accuracy of steel structure anchor bolts have a prominent impact on the safety and construction quality of steel structures. [0003] There is a combined multifunctional anchor bolt positioning template. The frame of the template is formed by connecting four telescopic rods in seque...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D27/42E04B1/41E02D15/02
CPCE02D15/02E02D27/42E04B1/41
Inventor 王新泉韩尚宇朱凯
Owner CITIC GUOAN CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products