Construction method for middle wall dismantling and two-side structure connecting
A construction method and structural connection technology, which are applied in basic structure engineering, underwater structures, artificial islands, etc., can solve the problems of long construction period, increased construction cost, quality accidents, etc. The effect of construction progress and cost saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 As shown, in this embodiment, the partition wall 1 is removed in sections, and then the corresponding floors of the structures on both sides of the partition wall 1 removal area are connected. When the partition wall 1 is removed twice in two sections, the partition wall 1 is divided into the partition wall 11 in the first zone and the partition wall 12 in the second zone, and the construction of the demolition of the partition wall 1 and the structural connection on both sides method, comprising the steps of:
[0032] Such as figure 2 As shown, S001: Temporary structural columns 2 are set on both sides of the partition wall 1;
[0033] Such as Figure 3 to Figure 4 As shown, S002: After the construction of the structures on both sides of the middle partition wall 1 is completed, cut and chisel the middle partition wall 1 in sections, lift the removed middle wall garbage, and connect the bottom, floor and roof of the structures on both sides, so tha...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com