Construction method for polishing outer mold of precast box beam
A construction method and box girder technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems that the appearance is difficult to make up, the quality of the project leaves hidden dangers, etc., so as to shorten the construction period of the beam, the construction is fast, and the economic benefits are good. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0043] Project example 1. Jiangmen section (K2+720~K44+100) project of Guangzhou-Fojiang Expressway-Heshan connecting line Fokai Expressway flyover bridge
[0044] 1.1 Project overview
[0045] The Heshan Link Fokai Expressway Bridge is located in Guqiao Village, Yayao Town, Heshan City. The center mileage of the bridge is LK1+341.5. 18×25+10×34+39.9+55+39.9+15×25 span combination, with a total length of 1499.8m.
[0046] 1.2 Construction situation
[0047] In the construction of the prefabricated small box girder of the Fokai high-speed flyover bridge, the template spraying release agent construction technology was used. The prefabricated small box girder field of the bridge is located on the subgrade behind the 0# platform of the Fokai high-speed flyover bridge. The box girder is prefabricated All use stainless steel steel molds, combined with spraying release agent, and adopt this construction technology to meet the requirements of standardized construction management.
example 2
[0048] Project Example 2: Chaohui Expressway Jinchang Road Elevated Bridge 1#
[0049] 2.1 Project overview
[0050] The 1# bridge of Jinchang Road in this contract section is next to Chaoshan International Airport in Denggang Town, with a starting point of K17+471.5 and an ending point of K21+325.5, with a total length of 3.854 kilometers. Among them, there are 1045 pieces of 30m small box girder, 185 pieces of 27m small box girder, and 40 pieces of 25m small box girder, all of which are prefabricated and installed.
[0051] 2.2 Construction situation
[0052] There are 3 track production lines in the beam manufacturing yard of the fourth industrial area, including the steel bar processing area, beam manufacturing area, and beam storage area, with an area of about 40,000 m2. For the girder-making tasks of Xiazheng Bridge, Jinchang Road Viaduct #1 Bridge, and the east-west ramp of the airport, a total of 3,310 pieces of prefabricated box girders, including 63 pieces of 20m...
example 3
[0053] Engineering Example 3: Hongpaihe Bridge
[0054] Engineering monitoring and result evaluation
[0055] After adopting the technology of spraying release agent on stainless steel formwork, the appearance of box girder concrete has been significantly improved, and the appearance quality of concrete has reached excellent. It solves the pollution of waterways due to excessive oil pollution, and brings a good environmental protection effect. The whole construction process is in a safe, stable, fast, high-quality and controllable state, which has been affirmed and praised by the owners and supervisors, and has achieved good economic and social benefits.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com