Method for constructing energy-saving building by using prefabricating method
A construction method and construction technology, applied in the direction of building structure, construction material processing, construction, etc., can solve problems such as difficult construction, and achieve the effect of shortening construction period, low cost, and simple principle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] A construction method for energy-saving building construction using prefabrication. The architectural design unit designs the drawings of the building to be built. When designing the drawings, the whole building is divided into several building modules according to the principle of force, and then the design drawings of the several building modules are Sent to the prefabricated unit for prefabrication of building modules, the prefabricated unit includes the following steps when prefabricating several building modules:
[0033] (1) Set up a prefabricated field in an open environment, and build a prefabricated house with adjustable internal environmental parameters;
[0034] (2) Set up a pedestal for prefabricated building modules in the prefabricated house;
[0035] (3) Use steel on the pedestal to build a prefabricated formwork corresponding to a single building module in accordance with the drawing standards of a single building module;
[0036] (4) Concrete pouring o...
Embodiment 2
[0040] This embodiment is further optimized on the basis of the above embodiments. Furthermore, in order to better realize the present invention, the prefabricated room is provided with an automatic adjustment system capable of adjusting temperature and humidity. The automatic adjustment control mode is adopted to adjust the temperature and humidity in the prefabricated house at any time according to the ambient temperature and humidity, so that the construction environment temperature and humidity are always kept at the optimum temperature required by the project, thus laying a solid foundation for ensuring the construction quality Foundation, so that the cured building modules meet the quality requirements.
Embodiment 3
[0042] This embodiment is further optimized on the basis of any of the above-mentioned embodiments. Further, in order to better realize the present invention, the construction steps of the prefabricated formwork are as follows:
[0043] (a) fixing the bottom formwork and end formwork according to the prefabricated formwork structure;
[0044] (b) Adjust the flatness of the bottom mold, the verticality of the end mold, and adjust the size between the templates until the specified requirements are met;
[0045] (c) Put the tied steel cage in the prefabricated formwork of the lower floor;
[0046] (d) Place the embedded parts according to the design drawing of the building module;
[0047] (e) Adjust the position of embedded parts and reinforcement cages in the prefabricated formwork according to the size requirements, and complete the construction of the prefabricated formwork.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com