First tunnel then station continuous construction shield station entering method
A technology for shield tunneling and stations, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as the impact of shield tunneling construction, achieve the effects of ensuring progress and safety, passing stations smoothly, and solving waterproof problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered.
[0020] figure 1 It is a structural block diagram of the continuous construction shield tunneling method of the tunnel first and then the station in the preferred embodiment of the present invention. Such as figure 1 As shown, the method for entering the station of the continuous construction shield tunnel at the station after the first tunnel of the present embodiment includes the following steps: a. At the station construction place, control the setting distance between the station enclosure structure and the center column, thereby forming a tunnel for use The shield machine can pass through the shield excavation space of the station; b. Reinforce the end of the station, reinforce the enclosure structure on the shield excavation line of the shield machine, and reserve...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com