Summer-time face excavation construction method for high and cold permafrost ultra-long highway tunnel
A technology for road tunnels and construction methods, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as high construction costs and difficulties in forming holes, and achieve the effect of avoiding damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Embodiments of the present invention: the implementation content of the "temperature control" technical solution for permafrost construction of the present invention is as follows:
[0031] 1. Tunnel excavation and side slope protection.
[0032] Organize the construction according to the principle of "excavating in layers and sections, excavating while protecting, excavating a section, and protecting a section". To gain time, the protective measures of "combination of permanent and impermanent" are adopted in support to ensure the safety of construction at the entrance of the cave. The specific construction sequence is:
[0033] (1) Excavation by positive bench method, loosening by weak blasting (less drilling and less charge to avoid freezing back in the borehole), supplemented by an excavator (with a breaker) for excavation and ballasting.
[0034] (2) By setting up a sunshade at the entrance of the cave, laying sandbags on the side slopes to cover the black sunshade...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com