Distribution network planning scheme evaluation data processing system
A technology for data processing systems and distribution network planning, which is applied in data processing applications, instruments, predictions, etc., and can solve problems such as few research results and unification
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] like figure 1 As shown, a data processing system based on an economical, reliable and flexible distribution network planning evaluation index system includes an economic index processing module 1 based on the life cycle cost, a reliability index processing module 2 based on the minimum path method, The flexibility index processing module 3 based on the maximum power supply capacity, and the fuzzy mathematics comprehensive evaluation processing module 4.
[0044] The economic index processing module based on the whole life cycle cost takes the investment cost, operation and maintenance cost, and life cycle of the distribution network planning scheme as input data, and after calculation and processing, it outputs the data of the full life cycle cost and the data based on the full life cycle cost. Economic indicators; the economic indicators based on the life cycle cost include four three-level index data of the life cycle cost, net present value, internal rate of return, ...
Embodiment 2
[0086] refer to figure 1 As shown, this embodiment is the distribution network planning scheme for the 2015 cultural tourism city project in an actual area of China. According to the predicted load forecasting situation of the medium scheme 119.8MVA, there are the following two power supply schemes:
[0087] Power supply scheme one:
[0088] Adopt 220 / 35 / 0.4 kV power supply mode, high-voltage distribution network adopts 220 kV voltage, medium-voltage distribution network cancels 10 kV voltage level, and adopts 35 kV direct drop 0.4 kV distribution network power supply mode.
[0089] Substation A is set up in the high-voltage distribution network. Considering that substation A is a user-specific substation and has declared a substation land area (4.3 mu), it adopts a terminal 220 kV indoor substation type construction, and is equipped with two 150 MVA main transformers. One-time construction; 2 circuits of 220 kV incoming lines, connected to 220 kV upper-level substation; 1...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com