A method for erecting the ground net of the first floor of the mining stope
A layer ground grid and mining technology is applied in the field of erection of the first layer ground grid in the mining stope. The effect of mine economic benefit, improving resource utilization rate and reducing mining difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The preferred embodiments of the present invention will be described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
[0028] Please also see Figure 1~3 ,in, figure 1 It is the structural representation of the palm bamboo frame of the present invention; figure 2 It is a structural representation of the palm bamboo frame group of the present invention; image 3 It is a schematic cross-sectional view of the top (bottom) column stope after the ground net is erected by the erection method of the present invention. A method for erecting the ground network of the first floor of a mining stope provided by the present invention comprises the following steps:
[0029] 1) The palm bamboo frame 11 is processed on site near the entrance of the first floor of the stope where the ground net ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com