Industrial big data driven total completion time prediction method
A big data-driven, time-to-make technology for engineering applications
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0066] The present invention will be further described in detail below in conjunction with the drawings and specific embodiments.
[0067] See figure 1 As shown, the embodiment of the present invention provides a total completion time prediction method driven by industrial big data, which includes the following steps:
[0068] S1. Build an industrial big data analysis platform containing relational database data, sensor data and controller data based on Hadoop, and go to step S2.
[0069] S2. Use the Apriori association rule mining algorithm under the MapReduce framework to analyze and mine in the industrial big data analysis platform to obtain the factors affecting the total completion time, and go to step S3.
[0070] S3. Combine the influence factors of the total completion time and the historical data of the total completion time, construct a neural network model BP, generate the initial weight of the neural network model BP, and go to step S4.
[0071] S4. Dynamically improve the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com