Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Integral lifting and installation method for pump protection pipe of deepwater offshore platform

An offshore platform and installation method technology, applied in the field of offshore oil engineering, can solve the problems of increasing the workload of cutting, docking and welding, and increasing the workload of the sea, so as to avoid margin cutting and docking, and avoid temporary construction of building and dismantling The workload of the platform and the effect of reducing the workload

Active Publication Date: 2016-05-11
CHINA NAT OFFSHORE OIL CORP +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since the connection section of the pump protection pipe generally considers a certain length of allowance, when installing the connection section, it is necessary to cut off the allowance of the connection section, which increases the workload of cutting, butt joint and welding; and, when welding the connection section, due to the height The reason is that sometimes it is necessary to build a temporary construction platform and dismantle the construction platform after the welding is completed, which not only increases the workload at sea; at the same time, due to the influence of the unevenness of the submarine installation of the jacket, the size of the pump protection pipe interface needs to be considered when the connection section is aligned shape error

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral lifting and installation method for pump protection pipe of deepwater offshore platform
  • Integral lifting and installation method for pump protection pipe of deepwater offshore platform
  • Integral lifting and installation method for pump protection pipe of deepwater offshore platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Such as figure 1 — Figure 6 As shown, the present invention adopts the following installation steps:

[0025] Step 1: pre-install the entire pump protection pipe 2 on the jacket 1, and then temporarily fix the entire pump protection pipe 2;

[0026] Step 2: install the upper block 3 on the jacket 1, and then remove the temporary fixation on the top of the entire pump protection pipe 2;

[0027] Step 3: Lift the entire pump protection pipe 2 to the design elevation through the winch or other lifting equipment installed on the upper block 3, and then fix the entire pump protection pipe 2 on the upper block 3 by welding deck.

[0028] Such as Figure 4 As shown, the top of the above-mentioned whole pump protection pipe 2 is provided with a suspension flange 21 with bolt holes. After the suspension flange 21 is paired with the top guide flange 22, it is temporarily fixed by bolt connection; wherein, the suspension flange 21 The upper part is provided with the lifting ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an integral lifting and installing method for a deeper water ocean platform pump protection pipe. The method comprises the step 1 that the whole pump protection pipe is previously arranged on a pipe frame, and then the whole pump protection pipe is temporarily fixed, the step 2 that an upper assembly is arranged on the pipe frame, and the temperature fixation to the whole pump protection pipe is removed, and the step 3 that the whole pump protection pipe is lifted to the designed elevation, and then the whole pump protection pipe is fixed to a deck of the upper assembly. The whole pump protection pipe is previously arranged on the pipe frame, and then the pump protection pipe is lifted to the designed elevation of the assembly to be fixed, so that margin cutting and butt joint to connecting sections of the pump protection pipe can be avoided, and the welding work amount is reduced. Furthermore, the work amount for constructing and disassembling a temporary construction platform is avoided, the marine work amount is greatly reduced, the marine construction period is shortened, and the construction cost is reduced.

Description

technical field [0001] The invention relates to an installation method of a pump protection pipe, in particular to an overall lifting installation method suitable for a pump protection pipe of a deep-water ocean platform. It belongs to the field of offshore oil engineering. Background technique [0002] Offshore platforms are the infrastructure for offshore oil and gas development, as well as the base for offshore production operations and living. There are various forms of offshore platforms. Among them, the jacket-type fixed platform is currently the most used platform form in China. It consists of two parts: the upper block structure and the lower jacket foundation structure. The installation of the jacket platform is generally carried out in two steps. First, the jacket structure is installed, and then the upper block structure is installed on the jacket. And this type of platform needs to set the design interface of the upper block and the jacket, for example: the sea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02B17/02
CPCE02B17/02
Inventor 刘洪涛叶永坤刘玉玺侯涛张孝卫黄怀州赵阔王明国张鑫孙晋华董宝辉阮胜福
Owner CHINA NAT OFFSHORE OIL CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products