Arid desert region soil engineering slope bandicoot-caused damage prevention and control method
A technology for engineering slopes and deserts, applied in infrastructure engineering, excavation, construction, etc., can solve the problems of rapid decline in effect, low work efficiency, difficulty in survival and reproduction of rodents, etc., and achieve the effect of weakening erosion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] In 2012, in Xiaolongkou Village, Dayou Town, Jimsar County, the slope of the dam soil slope was 5m high, the test slope was 36m long, and the ground slope was 30°-35°;
[0020] a. Slope surface cleaning: remove weeds, floating soil, residue, compaction caves, cut and fill the slope surface, and smooth the slope surface;
[0021] b. Slope reinforcement: excavate a diamond-shaped foundation trench on the slope with a prefabricated 0.8m concrete beam as the side length. The section size of the concrete beam is 7cm×15cm. The foundation trench is buried 10cm and the ground is exposed 3cm. The concrete beams are connected to form a diamond shape. Grid beam 1 structure, top beam 3 and bottom beam 4 are placed on the upper and lower ends of concrete grid beam 1, vertical beams 5 are placed every 10m between top beam 3 and bottom beam 4, and the bottom end of concrete grid beam 1 is open Slope foot interception ditch 2;
[0022] c. Take soil: take out part of the soil from the concret...
Embodiment 2
[0026] In 2013, in the 83-kilometer milestone standard canal section of Huangqi Dam in Karamay West Main Canal, the slope was 6m high, 100m long, and 30°-35°;
[0027] a. Slope surface cleaning: remove weeds, floating soil, caves, and debris on the slope surface, cut and fill and tamping to make the slope surface level;
[0028] b. Slope reinforcement: excavate a diamond-shaped foundation trench on the slope with a prefabricated 1.0m concrete beam as the side length. The section size of the concrete beam is 7cm×15cm, which is embedded in the foundation trench 11cm, and the ground is 4cm exposed. The concrete beams are connected to form a diamond shape. Grid beam 1 structure, top beam 3 and bottom beam 4 are placed on the upper and lower ends of concrete grid beam 1, vertical beams 5 are placed every 13m between top beam 3 and bottom beam 4, and the bottom end of concrete grid beam 1 is open Slope foot interception ditch 2;
[0029] c. Take soil: take out part of the soil from the gr...
Embodiment 3
[0033] In 2013, in Xiaoguai Village, Xiaoguai Township, Karamay, the slope of the water delivery channel was 3m high, the test slope was 50m long, and the ground slope was 30°-35°;
[0034] a. Slope surface cleaning: remove weeds, floating soil, residue, compaction caves, cut and fill the slope surface, and smooth the slope surface;
[0035] b. Slope reinforcement: excavate a rhombus base trough on the slope with a prefabricated 1.2m concrete beam as the side length. The section size of the concrete beam is 7cm×15cm. It is embedded in the base trough 12cm and exposed to the ground by 5cm. The concrete beams are connected to form a rhombus. Grid beam structure, top beam 3 and bottom beam 4 are placed on the upper and lower ends of concrete grid beam 1, vertical beams 5 are placed every 15m between top beam 3 and bottom beam 4, and the bottom end of concrete grid beam 1 is sloped Foot interception ditch 2;
[0036] c. Take soil: take out part of the soil in the concrete grid beam 1 gr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com