Construction method of temporary support of double-hole three-pipe gallery immersed tunnel and its vertical jack

An immersed tube tunnel and temporary support technology, which is applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as low positioning accuracy, high construction difficulty, and increased time for divers and diving construction, so as to improve stress conditions, The effect of convenient construction

Active Publication Date: 2015-10-28
TIANJIN MUNICIPAL ENG DESIGN & RES INST +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The main shortcomings of the four-point support method are: low positioning accuracy, four-point support to adjust the design elevation, the required divers and diving construction time increase, and the construction is difficult

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of temporary support of double-hole three-pipe gallery immersed tunnel and its vertical jack
  • Construction method of temporary support of double-hole three-pipe gallery immersed tunnel and its vertical jack
  • Construction method of temporary support of double-hole three-pipe gallery immersed tunnel and its vertical jack

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further described in detail below in combination with specific embodiments.

[0032] Such as figure 2 , image 3 and Figure 4 As shown, the present invention is a vertical jack system for the temporary support of double-hole three-pipe gallery immersed tube tunnels, including a vertical jack 2, the upper end of the vertical jack 2 is welded with a vertical jack upper embedded part 1, and the vertical jack The lower end of 2 is welded with a vertical jack push rod 4, and the vertical jack 4 is respectively fastened with the upper embedded part 1 of the vertical jack and the vertical jack push rod 4 at both ends with a bolt 5; The lower part passes through the lower embedded part 3 of the vertical jack, and a compression sleeve 6 is arranged between the push rod 4 of the vertical jack and the upper port of the embedded part 3 of the lower vertical jack, and the embedded part 3 of the lower vertical jack It is threadedly connected with th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a perpendicular jack system for a temporary support of a twin-pore immersed tube tunnel with three tube corridors. The perpendicular jack system comprises a perpendicular jack. An upper embedded part of the perpendicular jack is welded at the upper end of the perpendicular jack, a push rod of the perpendicular jack is welded at the lower end of the perpendicular jack, and the perpendicular jack is respectively fastened with the upper embedded part and the push rod, which are arranged at the two ends of the perpendicular jack, by bolts; the lower portion of the push rod penetrates a lower embedded part of the perpendicular jack, a compression sleeve is arranged between the push rod and an upper port of the lower embedded part, the lower embedded part is connected with the compression sleeve in a threaded manner, sealing packing is arranged below the compression sleeve, and an O-shaped rubber sealing ring is arranged between the push rod and a lower port of the lower embedded part; a grouting tube is arranged on the lower embedded part. The perpendicular jack system has the advantages that a three-point support mode is adopted, in other word, nose supports are arranged at the front end of a tube section, the perpendicular jack is arranged at the tail end of the tube section, the tail section of the tube section is arranged in partition walls of two side tube corridors in a supported manner, a transverse distance is long, accordingly, longitudinal and transverse structures of the integral tube section are stressed reasonably, the tube section is good in integral stability in tube section pull-in procedures, and the quantity of structure reinforcing steel bars can be correspondingly reduced.

Description

technical field [0001] The invention relates to a temporary support structure of an immersed tube tunnel, in particular to a temporary support structure after the pipe section is sunk and placed in place. Background technique [0002] The temporary support method after the pipe section sinks into place usually uses a nose pad at the butt end and a vertical jack at the other end, and there is also a precedent for all vertical jacks. Looking at the immersed tube tunnels that have been opened to traffic in China in recent years, the Guangzhou Pearl River Tunnel, the Ningbo Yongjiang Tunnel and the Shanghai Outer Ring Tunnel adopt a four-point support method. The specific method of the four-point support is: each pipe joint needs to be equipped with four supports The jack and the corresponding four temporary supports, and the two supporting jacks near the butt end of the pipe joint replace the lifting jack. But at this time, two docking positioning beams need to be placed on th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/073E02D15/08
Inventor 王艳宁徐杰刘文江曹景刘旭锴隋洪瑞黄思勇罗昊冲袁有为贺春宁陈鸿青二春马琳史庆春熊刚刘博海赵国勇贺海蒋宏伟包一杰
Owner TIANJIN MUNICIPAL ENG DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products