Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for achieving optimizing control of load of thermal power generating unit in PROPR mode

A load optimization control and thermal power unit technology, applied in the direction of electrical program control, comprehensive factory control, comprehensive factory control, etc., can solve the problems that affect the adjustment accuracy and response time, the influence of unit load control accuracy, and the large fluctuation of main steam pressure, etc. , to achieve the effect of improving adjustment accuracy and response time, ensuring control quality and assessment indicators, and ensuring the balance between supply and demand

Active Publication Date: 2014-04-09
STATE GRID CORP OF CHINA +1
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The actual operation proves that this control scheme can increase the overall adjustment rate of the assessment index by artificially increasing the load change rate of the unit, but the increase of the load change rate will cause large fluctuations in the main steam pressure of the unit, thus affecting the unit load. The control accuracy has a negative impact, affecting the adjustment accuracy and response time, which will eventually lead to unsatisfactory overall assessment results. In serious cases, the quality of the operation control results is not up to standard in the scheduling assessment and evaluation.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for achieving optimizing control of load of thermal power generating unit in PROPR mode
  • Method for achieving optimizing control of load of thermal power generating unit in PROPR mode
  • Method for achieving optimizing control of load of thermal power generating unit in PROPR mode

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0035] Such as Figure 4 , Figure 5 As shown, it is applied in a 300MW subcritical, intermediate reheating, and condensing coal-fired unit.

[0036] (1) Because the load range of dispatching and assessment units is generally 50%-100% of rated power, it is only necessary to correct the load point between 150-300MW, and use the GPS synchronous time synchronization system to take out the dispatching center at the same time point The AGC load command value sent by the CCS and the load command value received by the CCS are sent to the subtractor module to find out the deviation at the specified load point, and superimpose the deviation on the original command value to generate a nonlinear correction function F (x), as shown in Table 1.

[0037] Table 1

[0038]

[0039]

[0040] (2) Send the corrected AGC load command value and the actual power va...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for achieving optimizing control of the load of a thermal power generating unit in a PROPR mode. The method specifically comprises: step one, an AGC load instruction value issued by a dispatching center is analyzed and optimized through a function; step two, the corrected AGC load instruction value and a unit actual power value are subjected to different and judgment to generate the steam turbine master control feed-forward amount; step three, the corrected AGC load instruction value and the unit actual power value are subjected to the different and judgment to perform load change rate switching. The method performs feed-forward optimizing adjustment on a steam turbine master control of the unit by analyzing the load instruction value and the actual power value of the unit and judging the load real-time change situation of the unit, performs broken line optimizing adjustment on the load change rate of the unit, accordingly improves the adjusting accuracy and a response time index effectively while adjusting the rate index of the unit in the PROPR mode, and ensures supply and demand balance of power grid load and the stability of power grid frequency.

Description

technical field [0001] The invention relates to a thermal power unit load optimization control method, in particular to a thermal power unit load optimization control method in PROPR mode. Background technique [0002] With the rapid development of my country's power system, the capacity of the power grid is getting bigger and bigger, and the quality of electric energy is also getting higher and higher. For the safe and stable operation of the power grid, all large-scale thermal power units are required to use the AGC function, especially PROPR (etc. Adjustable ratio (normal adjustment) mode, this mode requires the load variation range of the unit to be large (generally requires 50%--100% rated load), within this range, the unit is required to respond quickly, accurately and stably to the load change demand issued by the power grid . [0003] (1) AGC assessment standards [0004] Such as figure 1 As shown in the typical AGC unit set point control process, this is a typical ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B19/418
CPCY02P90/02
Inventor 李军周长来
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products