H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof

A temporary consolidation and double-column pier technology, which is applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of inability to set up temporary support points, adverse environmental effects, and low construction efficiency, and achieve installation and dismantling operations Convenience and quickness, reduction of procedures, and improvement of construction efficiency

Inactive Publication Date: 2013-11-27
浙江交工宏途交通建设有限公司
View PDF3 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a kind of H-type double-column pier wide bridge deck cantilever temporary consolidation structure and its construction method, to solve the problem of traditional temporary consolidation structure applied to H-type double-column open pier and variable cross-section continuous box girder There are technical problems such as the inability to set up temporary support points, the high cost of traditional construction methods, low construction efficiency, and the adverse impact of high energy consumption on the environment.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
  • H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
  • H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] Examples see Figure 1~3As shown, an H-shaped double-column pier wide bridge deck cantilever temporary consolidation structure includes a concrete cap 1, a box-shaped continuous beam 2 located above the concrete cap, and multiple bridges connecting the concrete cap 1 and the box-shaped continuous beam 2. A support column 3, the support column 3 is divided into two rows and stands symmetrically on the front and rear sides of the pier column 13, and at least three columns are arranged on each side. Four corbels 4 poured integrally with the concrete cap 1, four oblique support columns 5 symmetrically distributed along the longitudinal bridge direction are connected between the corbels 4 and the box-shaped continuous beam 2, and the oblique support columns 5 and the support column 3 are located on the same straight line at the front and rear sides of the pier column 13, and the support column 3 and the oblique support column 5 are both steel pipe columns.

[0046] see fig...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Provided are an H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and a construction method thereof. The H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure comprises a concrete bearing platform, a box-shaped continuous beam located above the concrete bearing platform and a plurality of supporting columns connected with the concrete bearing platform and the box-shaped continuous beam. The supporting columns are symmetrically arranged on the front side and the rear side of the a pier column in two rows, four corbels poured into a whole with the concrete bearing platform are respectively symmetrically arranged at four corners of the concrete bearing platform along the left side and the right side of the transverse direction of a bridge, four inclined supporting columns symmetrically distributed along the longitudinal direction of the bridge are connected between the corbels and the box-shaped continuous beam, the supporting columns and the inclined supporting columns are steel pipe columns, a cast-in-place supporting beam is arranged on a base plate of the box-shaped continuous beam, and the supporting beam is in opposite-pull connection through prestress precision rolling threaded steel bars evenly distributed in the steel pipe columns. According to the H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure, the technical problems that temporary supporting points of a traditional temporary consolidation structure cannot be arranged, the fabricating cost is high, construction efficiency is low, and adverse effect is caused to the environment due to high energy consumption are solved.

Description

technical field [0001] The invention relates to a temporary consolidation structure and a construction method thereof in a bridge cantilever construction method, in particular to a structure for consolidation of a wide bridge surface of an H-shaped double-column pier and a construction method thereof. Background technique [0002] During the cantilever construction of the prestressed concrete continuous beam, no matter in the pouring stage, the movement of the hanging basket or the demolition stage, it is necessary to maintain a symmetrical and balanced construction. It shall not be greater than 20% of the weight of the bottom plate of a beam segment. Since the pier column and the continuous beam are hinged, the continuous beam does not bear the bending moment, so temporary consolidation measures should be taken during construction to consolidate the pier column and the continuous beam to withstand the asymmetric load in the cantilever construction. Temporary consolidation i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/10
Inventor 朱培良曾嵘江锋刘炳东曹珏宇
Owner 浙江交工宏途交通建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products