Elastomer composite mud absorption rubber tube and manufacturing technique thereof
A production process and elastomer technology, applied in the direction of hoses, pipes, tubular objects, etc., can solve the problems of shortened service life, wear, easy deformation of the pipe body, etc., to achieve excellent wear resistance, overcome the deformation of the pipe body, and improve the economic effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as figure 1 As shown, an intermediate layer 3 is arranged on the inner surface of the cord layer 4 of the mud suction hose 2, the intermediate layer is a canvas layer, and a composite layer 1 is arranged on the inner surface of the intermediate layer 3. The composite layer 1 is a polyurethane material, and the inner diameter after the composite is the same as The inner diameters of the existing mud suction hoses are the same. Cord layer 4, tight steel wire 5, rubber hose outer layer 6, steel ring 7, flange steel short sleeve 8 are the same as the prior art, and its production process is as follows:
[0029] (1) Tube embryo production: According to the thickness of the composite elastic body, design and determine the outer diameter of the forming mold for making the mud suction hose; fix one end of the flange steel short sleeve on the mud suction hose forming mold and position it according to the design requirements, and place it on the flange The inner side of the...
Embodiment 2
[0032] Such as figure 1 As shown, an intermediate layer 3 is arranged on the inner surface of the cord layer 4 of the mud suction hose 2, the intermediate layer is a canvas layer, and a composite layer 1 is arranged on the inner surface of the intermediate layer 3. The composite layer 1 is a polyurethane material, and the inner diameter after the composite is the same as The inner diameters of the existing mud suction hoses are the same. Cord layer 4, tight steel wire 5, rubber hose outer layer 6, steel ring 7, flange steel short sleeve 8 are the same as the prior art, and its production process is as follows:
[0033] (1) tube embryo production: same as embodiment 1;
[0034] (2) Centrifugal forming: fix the finished suction hose embryo on the bracket ( figure 2 , the bracket is composed of 2 circular frames, and 3 length-adjustable fixed arms are uniformly arranged in each circular frame, and the fixed arms are connected with the circular frame by bolts, and the adjacent ...
Embodiment 3
[0036] Such as figure 1 As shown, an intermediate layer 3 is arranged on the inner surface of the cord layer 4 of the mud suction hose 2, the intermediate layer is a canvas layer, and a composite layer 1 is arranged on the inner surface of the intermediate layer 3. The composite layer 1 is a polyurethane material, and the inner diameter after the composite is the same as The inner diameters of the existing mud suction hoses are the same. Cord layer 4, tight steel wire 5, rubber hose outer layer 6, steel ring 7, flange steel short sleeve 8 are the same as the prior art, and its production process is as follows:
[0037] (1) tube embryo production: same as embodiment 1;
[0038] (2) Centrifugal forming: fix the finished suction hose embryo on the bracket ( figure 2 , the bracket is composed of 3 circular frames, and 3 fixed arms with adjustable length are uniformly arranged in each circular frame, the fixed arms and the circular frame are connected by bolts, and the adjacent ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com