Vegetation recovery method for nonferrous metal mining wasteland
A non-ferrous metal and vegetation restoration technology, which is applied in the fields of site preparation methods, botanical equipment and methods, water conservancy projects, etc., can solve the difficult problems of vegetation restoration, achieve remarkable governance effects, prevent the diffusion of heavy metals and pollute the environment, and improve efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] Example 1 Vegetation Restoration of an Abandoned Copper Mine in Dexing, Jiangxi
[0030] The terrain of the abandoned land is a slope made of waste, and the surface soil contains heavy metals such as copper and arsenic, and the soil is weakly acidic. The processing steps are as follows:
[0031] (1) The abandoned land is arranged near the natural topography. The near-natural topography is carried out on the abandoned land, and the slope of the pile is flattened according to the slope of the natural repose angle to form a storage yard with a stepped slope, and an ecological bag retaining wall is set at the foot of the slope. The slope length of the step slope is 6m, the width of the step platform is 1.5m, and the height of the ecological bag retaining wall is 0.6m.
[0032] (2) Heavy metal stabilization treatment. The surface of the abandoned land is evenly covered with heavy metal stabilizers, and the stabilizer is mixed with the waste at a depth of 20-30cm in the sh...
Embodiment 2
[0041] Example 2 Vegetation Restoration and Treatment of Abandoned Aluminum Mine in Zibo, Shandong
[0042] Part of the abandoned land of the mine is slope land. The surface contains iron, titanium, scandium and other metals. The surface soil is alkaline. The treatment process of wasteland with sloping land is as follows:
[0043] (1) The abandoned land is arranged near the natural topography. Near-natural topography is implemented on abandoned land, and the slope of the pile is arranged according to the slope not greater than the natural repose angle to form a storage yard with a trapezoidal slope and a platform, and an ecological bag retaining wall is set at the foot of the slope. The trapezoidal slope is 8m long, the platform width is 3m, and the ecological bag retaining wall is 1.2m high.
[0044] (2) Heavy metal stabilization treatment. The surface of the abandoned land is evenly covered with heavy metal stabilizers, and rakes are used to mix the stabilizer and shall...
Embodiment 3
[0052] Example 3 Vegetation Restoration and Treatment of Abandoned Land of an Aluminum Mine in Shandong
[0053] The abandoned land of the mine is flat land with potholes. The process of restoring governance is the same as that in Embodiment 2, the different steps are:
[0054] (1) Carry out high excavation and low filling leveling on the flat land;
[0055] (4) Cutting and drainage ditches for abandoned land. The drainage ditch is set on the flat ground, the ditch width is 80-120cm, and the ditch is an arc-shaped ditch with a depth of 40-60cm. The distance between drainage ditches is 25m.
[0056] The recovery effect achieved is the same as in Example 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com