Precision measurement control method of metro track structure construction
A precision measurement and control method technology, applied in the direction of track, measuring instrument, track maintenance, etc., can solve problems such as many processes, large measurement errors, and control points that cannot be reused
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0014] The precise measurement and control method for subway track structure construction includes firstly setting up a number of control points to build a track foundation control network, using a total station to perform plane measurement and elevation measurement according to the track foundation control network, and then collecting data and feeding it back to the track geometric state measuring instrument for measurement. process, calculate the error of the corresponding position, and finally adjust and control the follow-up construction of the overall ballast bed, seamless track, and turnout according to the error. The specific method is as follows:
[0015] (1) The construction method of the track foundation control network is specifically to arrange the control points on the side walls of the left and right sides of the tunnel respectively. 60m, all control points are 0.7~1.2m higher than the rail surface of the preset rail row; the control points are specifically embedd...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com