Intermittent sectional quick solidification method for cadmium-free internal formation storage battery
A rapid curing and segmented technology, applied in the direction of lead-acid battery electrodes, etc., can solve the problems of long drying and curing time of the plate, easy cracks on the plate, and rapid water evaporation, etc., to shorten the curing time, the method is effective, Practical and convenient effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] Example 1, put the paste-coated wet plate in a dedicated curing room. The curing steps are: first stage temperature 80-85°C, humidity above 85%, curing time 1.5-2.2 hours, stop for 0.5 hours. In the second stage, the temperature is 75-80°C, the humidity is above 90%, the curing time is 1.5-2.2 hours, and the curing time is 0.5 hours. The third stage is temperature 70~75℃, humidity over 95%, curing time 1.5~2.2 hours. In the fourth section, the temperature is 65°C, the humidity is above 98%, and the curing time is 3.5 to 4.2 hours. The fifth stage is temperature 60℃, humidity above 98%, curing time 1.5-1.8 hours. The temperature of the sixth stage is 60°C, the humidity is 80%, and the curing time is 2.2 to 3.2 hours. The seventh stage is a temperature of 60°C, a humidity of 60%, and a curing time of 2.2 to 3.2 hours. Complete curing.
Embodiment 2
[0029] Example 2, put the paste-coated wet plate in a dedicated curing room. The curing steps are as follows: the first stage temperature is 84°C, the humidity is above 85%, the curing time is 1.2 hours, and the curing time is 0.5 hours. In the second stage, the temperature is 80°C, the humidity is above 90%, the curing time is 1 hour, and the curing time is 0.5 hours. 2小时。 The third section is a temperature of 74 ° C, a humidity of 95% or more, and a curing time of 1.2 hours. In the fourth section, the temperature is 65°C, the humidity is above 98%, and the curing time is 4.8 hours. The fifth stage is a temperature of 60°C, a humidity of 98% or more, and a curing time of 2 hours. The temperature of the sixth stage is 60°C, the humidity is 80%, and the curing time is 4 hours. The seventh stage is a temperature of 60°C, a humidity of 60%, and a curing time of 4 hours. Complete curing.
Embodiment 3
[0030] Example 3, put the paste-coated wet plate in a dedicated curing room, the curing steps are: first stage temperature 80°C, humidity above 85%, curing time 3 hours, stop for 0.5 hours. In the second stage, the temperature is 75°C, the humidity is above 90%, the curing time is 2.5 hours, and the curing time is 0.5 hours. The third stage is a temperature of 71°C, a humidity of over 95%, and a curing time of 2.5 hours. In the fourth section, the temperature is 65°C, the humidity is above 98%, and the curing time is 3 hours. The fifth stage is a temperature of 60°C, a humidity of 98% or more, and a curing time of 1.5 hours. The temperature of the sixth stage is 60°C, the humidity is 80%, and the curing time is 4 hours. The seventh stage is a temperature of 60°C, a humidity of 60%, and a curing time of 2 hours. Complete curing.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com