Quick-start unpowered biologically enhanced constructed wetland system suitable for treating domestic sewage and waste water in small towns
A technology of constructed wetland system and domestic sewage, which is applied in the field of fast-start non-powered bio-augmented constructed wetland system, which can solve the problems of random discharge and achieve the effects of reducing energy consumption, promoting growth and solving blockage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Quick-start non-powered landscape artificial wetland display system such as figure 1 shown.
[0022] Sewage first enters the reservoir (grit chamber) stage to remove impurities and suspended solids in the water, and then enters the wetland treatment unit. The wetland treatment unit is divided into three parts. The front part is a suspended biological packing bed, the middle part is a biological treatment subsurface flow wetland, and the rear part is a three-stage surface flow wetland. The three parts are connected in series. The entire wetland treatment system is designed and constructed according to the elevation difference of the terrain, so that the water inlet end is higher than the water outlet end, and the whole process runs without power.
[0023] The front suspended biological filler bed is 5-8m long, 1.5-2m wide, and 40-50cm deep. An impermeable membrane is laid on the bottom, and a pebble layer is laid on the impermeable membrane, with a thickness of 5-10cm; ...
Embodiment 2
[0027] By adding activated sludge to the filler during the construction of the constructed wetland, the start-up time of the constructed wetland is shortened from about 1 month to about 1 week, and the removal efficiency in the start-up stage is significantly improved, and the COD is increased by 10-20 %; total nitrogen increased by 10-15%;
[0028] Total phosphorus increased by 5-10%.
Embodiment 3
[0030] Sewage with the same concentration of pollutants passes through subsurface constructed wetlands with and without earthworms respectively. The experiment shows that earthworms have a certain influence on the content of organic matter in the constructed wetland. Through the physical and physiological effects of earthworms, the organic matter brought into the soil by sewage Removed by gut action of earthworms. The COD removal rate of some constructed wetlands with earthworms to treat rural domestic sewage reaches 83%-88%, and the BOD 5 The removal rate reaches 91%-96%, the SS removal rate reaches 85%-92%, and the organic matter removal rate effect is equivalent to that of ordinary activated sludge method. The nitrogen removal effect of earthworm wetland is obviously better than that of ordinary activated sludge method, and the removal rate of ammonia nitrogen reaches 55%-65%. Its effluent concentration is (12-20) mg / L, which can meet the requirements of national discharge...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com