Non-blasting construction method for dismantling pier to land bridge

A construction method and non-blasting technology, which is applied in building maintenance, construction, building construction, etc., can solve the problems of small working surface, high risk factor of work, unfavorable construction safety and other problems of cutting bridge main body, so as to achieve compact and operable construction process The effect of good performance and simple equipment

Active Publication Date: 2012-06-13
CHINA RAILWAY SIXTH GRP CO LTD +2
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the static cutting bridge demolition method, whether it is a wire saw bridge or a butterfly cutting bridge, the cutting equipment must be placed on the bridge surface to be cut, which will be detrimental to the construction safety, and the working surface when cutting the main body of the bridge is small. , the efficiency is low; when the bridge or pier is directly broken by the crushing method, the work risk factor is high, the labor volume is large, the economic cost is high, and the operation and construction requirements of the staff are high; when the bridge is demolished by the jacking method, it is necessary to set up supports, and the workload is large , the economic cost is high; and when the bridge is dismantled by hoisting, there are requirements for working conditions, and the location of the hoisting equipment needs to be considered

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Non-blasting construction method for dismantling pier to land bridge
  • Non-blasting construction method for dismantling pier to land bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The construction method of non-explosive demolition of bridge piers provided by the present invention to make the bridge land on the ground will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0016] Such as figure 1 Shown, the non-explosive demolition bridge pier provided by the present invention makes the construction method of bridge landing comprise the following steps carried out in order:

[0017] 1) Firstly, a gap 2 is formed through the middle position of the side top of the pier 1 by the staff using a crushing machine;

[0018] 2) Fill the gap 2 with a temporary sandbag support 3, and make the upper end of the temporary sandbag support 3 close to the bottom surface of the main beam 4;

[0019] 3) Remove the top structure of the pier 1 located on both sides of the temporary sandbag support 3, and the removal height is greater than the height of the temporary sandbag support 3. When removing the two sides, k...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a non-blasting construction method for dismantling a pier to land the bridge. The method comprises the following steps of: forming a notch from the top middle of the pier; filling the notch with sandbag temporary supports; dismantling the pier top structures on the two sides of the sandbag temporary supports so that a girder falls on the sandbag temporary supports; placing sandbag temporary supports on the top surfaces on the two sides of the upper end of the pier respectively; and releasing sand in the middle sandbag temporary supports so that the girder falls on the sandbag temporary supports on the two sides until the end part of the bridge falls on the ground. The construction method has good safety, effectively controls the falling speed and amplitude of the bridge, ensures the construction safety, and is economical. The equipment is relatively simple, the construction cost is relatively low, and the operability is high. The dismantled machinery does not need to be placed on the bridge floor, and a bracket below the bridge floor is not required either; and moreover, the working surface is large, the construction is flexible, the operability is high, the construction process is compact, the construction period is short, and the practicability is strong.

Description

technical field [0001] The invention belongs to the technical field of bridge dismantling and construction, and in particular relates to a construction method for dismantling bridge piers without blasting to land the bridge. Background technique [0002] Cable-stayed bridge, also known as cable-stayed bridge, is a bridge in which the main girder is directly pulled on the bridge tower with multiple prestressed rigid cable-stayed rods. A structural system composed of beams and bodies. The cable-stayed bridge mainly includes two piers, tower piers, bridge towers, main girder and multiple cable-stayed rods; the two bridge piers and the tower piers are vertically arranged at the two ends and the middle of the cable-stayed bridge respectively; the main girder spans the two On the top surface of a bridge pier and a tower pier, it is composed of a plurality of main girder sections connected end to end; the bridge tower is vertically installed on the main girder located on the upper...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D24/00
Inventor 李强王成博罗彬刘振薛江何震李自林孔祥阳
Owner CHINA RAILWAY SIXTH GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products