Followed vibration well cementation method
A cementing and resonator technology, which is applied in vibration generating devices, earthwork drilling, wellbore/well components, etc., can solve the problem of no direct correlation of cementing quality, single function of cementing plug, and inability to move casing. And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Example 1: Cementing implementation method for test well in a certain oilfield ##4—According to the open hole drilling data and cementing task book for casing completion, consider the initial setting time of the cement slurry system 100min and the displacement displacement of the equipment 8L / s. Set the starting time of 20min (according to the correlation between casing length and starting time, the fundamental frequency is automatically set to be about 29Hz), and the vibration duration is 30min. The application effect of acoustic amplitude logging is that the quality rate of the sealing section reaches 86.5%, the pass rate is 100%, and the cementing quality is evaluated as excellent.
Embodiment 2
[0038] Example 2: Implementation method of cementing for a certain oilfield ##105 exploration well—According to the open hole drilling data and cementing task book for casing completion, consider the initial setting time of the cement slurry system 110min and the displacement displacement of the equipment 8L / s. Set the starting time of 25min (according to the correlation between casing length and starting time, the fundamental frequency is automatically set to be about 27Hz), and the vibration duration is 40min. The application effect of acoustic amplitude logging is that the quality rate of the sealing section reaches 97.6%, the pass rate is 100%, and the cementing quality is evaluated as excellent.
Embodiment 3
[0039] Example 3: Implementation method of cementing for a certain oilfield ##66 development well—According to the open hole drilling data and cementing task book of the casing completion, the initial setting time of the cement slurry system is 120min and the displacement of the equipment is 8L / s, set the starting time 30min (according to the correlation between the casing length and the starting time, the fundamental frequency is automatically set to about 26Hz), and the vibration duration is 50min. The application effect of acoustic amplitude logging is that the quality rate of the sealing section reaches 65.1%, the pass rate is 100%, and the cementing quality is evaluated as good.
[0040] Therefore, the advantages of the present invention are as follows:
[0041] (1) The function of avoiding conventional rubber plugs is single, and the function of movable casing is increased;
[0042] (2) Do not change the existing construction technology, implement accompanying vibration throu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com