Allocation method, system and apparatus for continuous scheduling resource
A continuous scheduling and resource technology, applied in the field of communication, can solve the problems of inability to realize multi-cycle continuous scheduling resource allocation, and inability to determine the details of multi-cycle continuous scheduling resource allocation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0090] The embodiment of the present invention follows the conclusion of LTE, configures the period of persistent scheduling by network side signaling, the frequency position and MCS of PDCCH allocation of persistent scheduling resources, etc., but refines the two characteristics of multi-period persistent scheduling, and provides a A method and system for allocating persistent scheduling resources are used to realize the allocation of multi-period persistent scheduling resources.
[0091] In the embodiment of the present invention, two characteristics of the multi-period persistent scheduling include: there are multiple persistent scheduling periods; the specific value of the persistent scheduling period corresponds to the subframe transition point and the subframe where the initial transmission occurs.
[0092] The uplink and downlink subframe switching point period and switching point configuration of LTE TDD are determined in the system broadcast, that is, they are determin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com