Construction method for increasing dry auger boring pouring pile bearing capacity

A technology of auger drilling and construction method, which is applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of large diameter of cast-in-situ piles, reduce frictional resistance, increase project cost, etc., and achieve the improvement of single pile bearing capacity, Improvement of pile end bearing capacity and reduction of engineering cost

Inactive Publication Date: 2008-03-26
李树源
View PDF3 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In order to increase the bearing capacity of a single pile and make the pile length above the groundwater level, a construction technique of tamping and expanding piles has appeared. However, this construction method has large vibration and high noise, which not only causes noise pollution to residents, but also causes damage to surrounding buildings on the construction site. damage, so it cannot meet the construction requirements in the urban area
In order to solve the problem of pile formation through the groundwater layer, construction techniques such as drilling and grouting pile formation, jet grouting bottom expansion method, and steel casing retaining wall pouring method have appeared one after another. These methods have a long construction period and a large amount of cement. High project cost, not economical enough
The invention patent with the patent number of 97119826.8 provides a construction technology of rotary drilling mud retaining cast-in-place pile. This construction technology will not only produce mud pollution, but also reduce frictional resistance by the mud skin formed around the pile body
In order to improve the bearing capacity of single piles, the cast-in-place piles designed with this construction technology often have larger diameters and too long pile lengths, making construction difficult and increasing the project cost
In order to solve the above problems, the invention patent with the patent number 00100760.2 provides a post-grouting process for the side of the cast-in-place pile, which effectively improves the frictional resistance of the pile side, and the invention patent with the patent number 200310102269.2 provides a bored cast-in-situ pile The pile side and pile bottom post-grouting construction technology can further improve the pile end bearing capacity on the basis of effectively improving the pile side friction resistance. For the bearing capacity of dry auger bored piles above the groundwater level, the above construction methods must be improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for increasing dry auger boring pouring pile bearing capacity

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] The construction method for improving the bearing capacity of dry auger bored piles. The pile length is designed above the groundwater level, and the auger drill is used to dry drill the hole to the design depth, and the virtual soil scattered at the bottom of the hole is compacted with a rammer; Two grouting pipes 3 are symmetrically fixed on the side wall of 1 by using U-shaped clips 4. The grouting pipes 3 are PVC plastic hard pipes with a diameter of 20mm, and there are connections on the grouting pipes at the lower 1 / 3 height of the pile hole. The lower end of the grouting pipe 3 bends toward the center of the pile hole and contacts the bottom of the hole, and the side of the grouting pipe 3 that is 10 cm below the one-way valve 5 and contacts the wall of the pile hole is processed with a 6 small grouting holes 6 with a diameter of 4 mm, and 6-8 small grouting holes 6 with a diameter of 5 mm are processed on the side where the curved part of the lower part of the gr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
Login to view more

Abstract

The construction process of raising the bearing capacity of auger boring pile includes setting two grouting pipes symmetrically beside the side wall of pile hole, setting reinforcing cage and grouting concrete with concrete pumping agent in 1-1.5 wt% of cement, and pressure grouting cement slurry with concrete pumping agent in 1 wt% of cement and concrete expanding agent in 5 wt% of cement in the pumping pressure of 200-300 kg / sq cm in 8-24 hr after filing until cement slurry overflows from the top end beside the pile. The process can raise the bearing capacity of the pile by over 1 time, reduce the length of the pile, save material, lower cost and reduce construction pollution.

Description

technical field [0001] The invention relates to a construction method of pile foundation engineering, in particular to a construction method for improving the bearing capacity of dry auger bored piles. Background technique [0002] At present, most high-rise buildings use bored pile foundations in order to meet the design bearing capacity and settlement requirements. Dry auger bored pile construction is an economical and environmentally friendly pile foundation construction technology, but it is only suitable for construction above the groundwater level, so the pile length can only be designed above the groundwater level. In recent years, with the continuous improvement of the design height of buildings, the requirements for the bearing capacity of pile foundations have also become higher and higher, and the construction technology of dry auger bored piles has been greatly restricted. In areas where the groundwater level rises, it is almost Be eliminated. In order to incre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/34E02D5/62
Inventor 李树源高同王传家
Owner 李树源
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products