Treatment method for solidifying bed mud in river
A technology for solidification treatment and bottom mud, applied in the field of environmental engineering, can solve the problems of poor soil mechanics, difficult to dispose of on a large scale, difficult to control costs, etc., and achieve the effects of saving processing costs, low costs, and easy operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] Take Suzhou Creek sludge with a water content of 90%, and add 2% coal-fired slag, 3% quicklime and 3% gypsum to the bottom sludge based on the weight of the bottom sludge, and stir and mix to form a mixture. Afterwards, based on the weight of the mixture, 6% of brick chips were added to the mixture, and the solidified precursor was formed after thorough mixing. Spread the cured precursor with a thickness of 30cm in a ventilated rain shelter and add sacks to cover it for curing. The curing temperature is kept above 0°C. When the curing time is less than 7 days, the cured block should avoid contact with moisture such as rainwater. After 7 days, the compressive strength of the cured block can reach 5.3MPa; after 7 days, pour water on the covering such as sacks to keep the covering wet state, continue curing, after 28 days of curing, the compressive strength of the cured block reaches 12.2MPa. The formed cured body can be used to replace concrete blocks in pavement and par...
Embodiment 2
[0019] Take Suzhou Creek sludge with a moisture content of 95%, and add 4% coal-fired slag, 2% quicklime and 2% gypsum to the bottom sludge based on the weight of the bottom sludge, and stir and mix to form a mixture. Afterwards, based on the weight of the mixture, 4% brick chips were added to the mixture, and the cured precursor was formed after thorough mixing. Spread the cured precursor with a thickness of 5cm in a ventilated rain shelter and add sacks to cover it for curing. The curing temperature is kept above 0°C. When the curing time is less than 7 days, the cured block should avoid contact with moisture such as rainwater. After 7 days, the compressive strength of the cured block can reach 6.1MPa; after 7 days, pour water on the covering such as sacks to keep the covering wet state, continue curing, after 28 days of curing, the compressive strength of the cured block reaches 13.6MPa.
Embodiment 3
[0021] Take Suzhou Creek sludge with a water content of 98%, and add 6% coal-fired slag, 1% quicklime and 1% gypsum to the bottom sludge based on the weight of the bottom sludge, and stir and mix to form a mixture. Afterwards, based on the weight of the mixture, 6% of brick chips were added to the mixture, and the solidified precursor was formed after thorough mixing. Spread the cured precursor with a thickness of 30cm in a ventilated rain shelter and add sacks to cover it for curing. The curing temperature is kept above 0°C; when the curing time is less than 7 days, avoid contact between the cured block and rainwater and other moisture. In one day, the compressive strength of the cured block can reach 3.6 MPa; after 7 days, pour water on the covering such as sacks to keep the covering in a moisture-wet state, and continue curing. After 28 days of curing, the compressive strength of the cured block can reach 10.3 MPa.
PUM
Property | Measurement | Unit |
---|---|---|
strength | aaaaa | aaaaa |
compressive strength | aaaaa | aaaaa |
compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com