Comprehensive scheduling method considering on-time completion and energy consumption
A scheduling method and technology of energy consumption, applied in data processing applications, instruments, calculations, etc., to achieve the effect of adjusting procedures, flexible procedures, and flexible selection of processing machines
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] A comprehensive scheduling method considering on-time completion and energy consumption, which is characterized in that: first, the scheduling sequence of each process is determined; and different strategies are used to screen equipment sets according to the subtree key energy consumption process and the non-subtree key energy consumption process; When the subtree's key energy-consuming process does not meet the time constraints after scheduling on the initial processing equipment, the whole strategy is used to re-determine the process processing equipment; the processes that do not meet the delivery date are re-scheduled.
Embodiment 2
[0038] The above-mentioned flexible comprehensive scheduling method for the second workshop in which the buffering process is migrated in advance, the specific implementation steps of the scheduling method are as follows:
[0039] Step 1: Calculate the process processing energy consumption, virtual energy consumption, equipment startup energy consumption, average processing time, subtree power delivery period and period radius;
[0040] Step 2: Split the process tree into subtree powers, calculate the key energy consumption paths of the subtrees, and sort them in descending order
[0041] Step 3: Select the processing equipment of the key energy-consuming process of the subtree by using the process time and consumption balancing strategy, and determine the selection order of process processing according to the energy consumption priority strategy;
[0042] Step 4 judges whether the key energy consumption process of the subtree satisfies the equipment process adjustment strateg...
Embodiment 3
[0049]The above-mentioned comprehensive scheduling method considering on-time completion and energy consumption, and the energy consumption priority strategy, first set the priority for the process, and the higher the priority, the more scheduled it is; when the priority of the process is the same, the priority is to schedule the subtree For processes with longer critical energy consumption paths, non-subtree critical energy consumption processes with shorter average processing time are selected for scheduling; when subtrees have the same length of critical energy consumption paths or the same average processing time, select subtrees with lower virtual energy consumption. Process priority scheduling.
[0050] The above-mentioned comprehensive scheduling method considering on-time completion and energy consumption, and the process time and consumption balancing strategy, calculate their weights in the optional equipment set respectively, select the equipment with the smallest we...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com