Comprehensive scheduling method considering on-time completion and energy consumption
A scheduling method and technology of energy consumption, applied in data processing applications, instruments, calculations, etc., to achieve the effect of adjusting procedures, flexible procedures, and flexible selection of processing machines
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] A comprehensive scheduling method considering on-time completion and energy consumption, which is characterized in that: first, the scheduling sequence of each process is determined; and different strategies are used to screen equipment sets according to the subtree key energy consumption process and the non-subtree key energy consumption process; When the subtree's key energy-consuming process does not meet the time constraints after scheduling on the initial processing equipment, the whole strategy is used to re-determine the process processing equipment; the processes that do not meet the delivery date are re-scheduled.
Embodiment 2
[0038] The above-mentioned flexible comprehensive scheduling method for the second workshop in which the buffering process is migrated in advance, the specific implementation steps of the scheduling method are as follows:
[0039] Step 1: Calculate the process processing energy consumption, virtual energy consumption, equipment startup energy consumption, average processing time, subtree power delivery period and period radius;
[0040] Step 2: Split the process tree into subtree powers, calculate the key energy consumption paths of the subtrees, and sort them in descending order
[0041] Step 3: Select the processing equipment of the key energy-consuming process of the subtree by using the process time and consumption balancing strategy, and determine the selection order of process processing according to the energy consumption priority strategy;
[0042] Step 4 judges whether the key energy consumption process of the subtree satisfies the equipment process adjustment strateg...
Embodiment 3
[0049]The above-mentioned comprehensive scheduling method considering on-time completion and energy consumption, and the energy consumption priority strategy, first set the priority for the process, and the higher the priority, the more scheduled it is; when the priority of the process is the same, the priority is to schedule the subtree For processes with longer critical energy consumption paths, non-subtree critical energy consumption processes with shorter average processing time are selected for scheduling; when subtrees have the same length of critical energy consumption paths or the same average processing time, select subtrees with lower virtual energy consumption. Process priority scheduling.
[0050] The above-mentioned comprehensive scheduling method considering on-time completion and energy consumption, and the process time and consumption balancing strategy, calculate their weights in the optional equipment set respectively, select the equipment with the smallest we...
PUM
![No PUM](https://static-eureka-patsnap-com.libproxy1.nus.edu.sg/ssr/23.2.0/_nuxt/noPUMSmall.5c5f49c7.png)
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka-patsnap-com.libproxy1.nus.edu.sg/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com