Steel structure installation construction technology based on BIM technology

A construction technology and steel structure technology, applied in building construction, building material processing, construction, etc., can solve the problems of high labor cost, complex spatial layout structure system, affecting project progress and construction cost, etc., to speed up installation efficiency Effect

Pending Publication Date: 2022-07-12
XINJIANG CONSTR ENG GRP
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, there are still many problems in the construction of steel structures in building installation projects, including errors and position deviations in the main structure and embedded parts when the assembled steel structures are in place, which seriously affect the progress of the project and construction costs.
Due to the particularity of the steel structure engineering industry, such as the difficulty of factory manufacturing and on-site installation management, high labor intensity, and high labor costs, the application of BIM technology is imminent, but at the same time, the complexity of its spatial layout and structural system, It also makes the application of BIM technology in steel structure engineering more difficult

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel structure installation construction technology based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] A steel structure installation and construction technology based on BIM technology, such as figure 1 shown, including the following steps:

[0026] S10: According to the characteristics of the project, deploy BIM personnel with 3 years of work experience, set up a project BIM implementation team, and select BIM software;

[0027] S20: Carefully read the construction drawings of the project, and build a parametric 3D model according to modeling specifications and modeling standards;

[0028] S30: Generate a BIM building model corresponding to the main body of the steel structure building in the BIM software, generate a BIM installation equipment model corresponding to the installation equipment, and finally generate a BIM exterior wall model corresponding to the steel structure exterior wall;

[0029] S40: Prepare the BIM building model, installation equipment model and BIM exterior wall model according to the installation and construction plan, prepare visual disclosur...

Embodiment 2

[0036] A steel structure installation and construction technology based on BIM technology, such as figure 1 shown, including the following steps:

[0037] S10: According to the characteristics of the project, deploy BIM personnel with 5 years of work experience, set up a project BIM implementation team, and select BIM software;

[0038] S20: Carefully read the construction drawings of the project, and build a parametric 3D model according to modeling specifications and modeling standards;

[0039] S30: Generate a BIM building model corresponding to the main body of the steel structure building in the BIM software, generate a BIM installation equipment model corresponding to the installation equipment, and finally generate a BIM exterior wall model corresponding to the steel structure exterior wall;

[0040] S40: Prepare the BIM building model, installation equipment model and BIM exterior wall model according to the installation and construction plan, prepare visual disclosur...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a steel structure installation construction process based on a BIM technology, which comprises the following steps: deploying BIM personnel according to project characteristics, selecting BIM software, generating a BIM building model corresponding to a steel structure building main body in the BIM software, generating a BIM installation equipment model corresponding to installation equipment, and finally generating a BIM outer wall model corresponding to a steel structure outer wall. And carrying out three-dimensional technical disclosure and guiding on-site construction. According to the method, the deepening design work of the support hanger is completed before steel structure machining, nodes in steel structure engineering are complex and diverse, and scientific and reasonable experiment arrangement can be conducted on installation of the overall nodes and structures of building engineering before construction by using the collision detection function of a model in BIM software; through a simulation experiment function of software, reasonable detection can be carried out on nodes and structures in the whole project, it is guaranteed that the problem that components collide with one another in actual construction of the project is avoided, and the overall construction and installation efficiency of the project is improved.

Description

technical field [0001] The invention relates to the technical field of engineering construction, in particular to a steel structure installation and construction technology based on BIM technology. Background technique [0002] At present, there are still many problems in the construction of steel structures in building installation projects, including errors and positional deviations in the main structure and embedded parts when the prefabricated steel structure is in place, which seriously affects the project progress and construction costs. Due to the particularity of the steel structure industry, such as the difficulty of factory manufacturing and on-site installation management, the high labor intensity and the high labor cost, the application of BIM technology is imminent, but at the same time, its spatial layout and the complexity of the structural system, It also makes the application of BIM technology in steel structure engineering more difficult. SUMMARY OF THE I...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/14G06F30/13G06F30/20
CPCE04G21/14G06F30/13G06F30/20
Inventor 万坤韦佑鑫袁海顾允东游滔姜岩岩杨智然阮光来有英
Owner XINJIANG CONSTR ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products