Method and system for processing man-hour data based on isolated forest algorithm
A forest algorithm and data processing technology, applied in data processing applications, calculations, computer components, etc., can solve the problems of excessive data loss, large daily working hours, etc., and achieve the goal of improving calculation accuracy, improving efficiency, and ensuring accuracy Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The technical solutions of the various embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts fall within the protection scope of the present invention.
[0038] Such as figure 1 and figure 2 As shown, a kind of work-hour data processing method based on isolated forest algorithm provided by the present invention comprises the following steps:
[0039] Step 1: Obtain all the equipment working hours data in the time period T, and build them into an equipment working hours data package B 1 The equipment working hours data contains three types of information: data label s, data generation time t and equipment working time Δt; the dat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com