Outer-blasthole time-delay intelligent detonation network system and detonation method thereof

A technology of detonation network and delay network, which is applied in the direction of blasting, can solve the problems of few successful cases and high cost, and achieve the effect of enhancing reliability, increasing the total number of rows, and ensuring stability

Active Publication Date: 2022-02-15
HUNAN SHIZHUYUAN NON FERROUS METAL +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the cost of this kind of delay detonator is too high, it is a one-time consumption product, and the delay time is less than or equal to 2000ms, and it is only promoted in open-pit mines. Due to more restrictions on use conditions, there are few successful cases in underground mines.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Outer-blasthole time-delay intelligent detonation network system and detonation method thereof
  • Outer-blasthole time-delay intelligent detonation network system and detonation method thereof
  • Outer-blasthole time-delay intelligent detonation network system and detonation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] Such as Figures 1 to 2As shown, a smart detonation network system 100 with time delay outside the hole includes a smart detonator 20 . The intelligent detonator 20 has a built-in PLC control unit 40, which is a 10ms time base, and is used to set the delay time of the intelligent detonator 20, and issue an instruction to control the detonation to the intelligent detonator 20. The intelligent detonator 20 also includes some delay detonation units 21, and some delay detonation units 21 are respectively connected with some timing units 41 arranged in the PLC control unit 40, so that the corresponding delay detonation units are set by the timing unit 41 21 delay detonation time. Several delay initiation units 21 are respectively connected to several delay network systems 30 , and each delay initiation unit 21 is independent of each other to respectively control the initiation of their corresponding delay network systems 30 .

[0042] Such as Figures 1 to 2 As shown, in ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an outer-blasthole time-delay intelligent detonation network system and a detonation method thereof. An intelligent exploder and a plurality of groups of time-delay network systems which are connected with each other are arranged, and a PLC control unit is used for setting time-delay time and sending a detonating instruction, so that the combination of a time-delay network wire slot, the intelligent exploder and a traditional detonating device is realized; and the implementation reliability of the millisecond blasting outer-blasthole time-delay blasting network is improved. Besides, the delay network wire slot is formed by grooving on a rock wall through a grooving machine, is used for wiring connection of the explosion propagation equipment and connecting pieces, and is filled with a flame-retardant filler, so that damage of front-row blasting shock waves to other subsequent blasting networks can be prevented. By means of the mode, the number of operation faces of one-time millisecond blasting can be greatly increased, the application range of millisecond blasting in the fields of residual ore recovery, shock absorption blasting or blasting without space limitation and the like is expanded, meanwhile, the blasting cost is reduced, the safety management prevention and control risk is reduced, and the blasting implementation effect is improved.

Description

technical field [0001] The invention relates to the technical field of mining blasting, in particular to a time-delay intelligent initiation network system outside a hole and an initiation method thereof. Background technique [0002] In the field of mining, the blasting of mines has always been an extremely important part. Blasting techniques include many types, among which differential blasting is one of the most widely used blasting techniques. Micro-differential blasting has the advantages of improving blasting effect, effectively controlling blasting shock waves, and reducing blasting vibration, noise, flying stones and other hazards. The blasting delay technology is divided into two types: inside-hole delay and outside-hole delay according to the layout form. Among them, the delay network in the hole has the characteristics that the blasting network should not be affected by the explosion of the surrounding blastholes. It is widely used, but its delay time is easily a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): F42D1/055
CPCF42D1/055Y02P90/02
Inventor 孙健何斌全欧任泽刘子强刘奇陈功詹进雷成周礼龚永超
Owner HUNAN SHIZHUYUAN NON FERROUS METAL
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products