Building engineering cost and progress management system and method based on BIM technology
A technology for construction engineering and progress management, applied in data processing applications, special data processing applications, office automation, etc., can solve problems such as inability to accurately predict project progress, increase project cost, and construction progress management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Such as figure 1 As shown, Embodiment 1 of the present application provides a construction project cost and progress management method based on BIM technology, including:
[0030] Step 110, pre-simulating the cost-schedule correlation model based on the collected historical best BIM models of each construction unit and the corresponding final BIM models;
[0031] Since the relationship between project cost and progress is neither positive nor negative, sometimes speeding up the progress will increase the cost, and sometimes speeding up the progress will reduce the cost. Different, so according to the original construction progress of each construction unit, that is, the best BIN model and the final BIM model obtained due to the progress adjustment, the relationship between the cost progress of each construction unit is simulated based on the big data intelligent analysis method.
[0032] Specifically, simulating the cost-schedule correlation model specifically includes...
Embodiment 2
[0042] Such as figure 2 As shown, Embodiment 2 of the present application provides a BIM technology-based construction project cost and progress management system 20, including:
[0043] The construction cost schedule correlation model building module 21 is used for simulating the cost schedule correlation model according to the historical best BIM model and the corresponding final BIM model of each construction unit collected in advance;
[0044] The project cost schedule prediction module 22 is used to collect project information to be managed, create a BIM model according to the multi-party construction engineering modeling method, input the created BIM model into the cost schedule correlation model, and predict the project cost schedule plan;
[0045] The project progress management module 23 is used to obtain the project progress regularly, import the project progress file into the BIM model, determine the current project cost progress, compare the current project cost p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com