In-plant economic operation method based on static load distribution table
A static load and economical operation technology, applied in the field of in-plant economical operation based on the static load distribution table, can solve problems affecting the accuracy and timeliness of hydropower stations, and increase the difficulty of economical operation, so as to overcome the calculation scale and complexity, avoid Falling into a local optimal solution, the effect of high-efficiency calculation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] Such as figure 1 As shown, in this embodiment, a plant economic operation method based on a static load distribution table is provided, including the following steps,
[0073] S1. Establish a static load distribution model and determine the model solution algorithm;
[0074] S2. Discretize the feasible output space of the hydropower station with a certain accuracy under different water heads, solve the optimal distribution scheme of all discrete loads according to the flow characteristic curve of each unit, and establish the optimal static load distribution table under each water head;
[0075] S3. Find the load distribution plan corresponding to the actual load command in the optimal static load distribution table under each water head, so as to realize the optimal distribution in the current period.
[0076] In this embodiment, step S1 specifically includes the following content,
[0077] S11. According to the given load requirements, a load static distribution mode...
Embodiment 2
[0127] In this embodiment, taking the in-plant economic operation of Wujiangdu Hydropower Station as an example, the static load distribution method of the present invention is used to study the load distribution of Wujiangdu Hydropower Station to illustrate the effectiveness and rationality of the present invention.
[0128] Wujiangdu Hydropower Station is located in Zunyi City, Guizhou Province. It is the fourth level of cascade hydropower station on the main stream of Wujiang River. The total installed capacity of Wujiangdu Hydropower Station is five 250MW units, with an installed capacity of 1250MW. Units #1, #2, and #3 are of the same model, and units #4 and #5 are of the same model. The characteristics of the units are shown in Table 1.
[0129] Table 1 Characteristics of each unit of Wujiangdu Hydropower Station
[0130]
[0131] The flow characteristic curve of the unit represents the relationship between the output (N) and water consumption (Q) of the unit under di...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com